Filter Search


Asia


Location Summary Deadline
China Contract Awarded For: Southwest Oil And Gas Branch Of China Petroleum And Chemical Corporation In 2025 Guangyuan Natural Gas Purification Co., Ltd. Third And Fourth Joint Maintenance Project Maintenance And Maintenance Workshop Control Butterfly Valve Pub 2025-05-20
China Contract Awarded For: Sinopec (tianjin) Petrochemical Co., Ltd.'s Re-engineering (first Re-engineering) Sinopec (tianjin) Petrochemical Co., Ltd.'s Seawater Electrolysis Hydrogen Production Pilot Device316+20# 10kg/h Bidding Announcement.sinopec (tianjin 2025-05-20
China Contract Awarded For: China Petroleum And Chemical Corporation Nanjing Chemical Industry Co., Ltd. Multiple Projects, See Detailed Baffle Platet=6 02.270-3 Items 11 S30408 ??tender Announcement [change Announcement].sinopec Group Nanjing Chemical Industr 2025-05-20
China Contract Awarded For: Sinopec Hainan Refining And Chemical Co., Ltd. Hainan Refining And Chemical Olefins Department Ethylene Device Dryer Double Gate Valve Body Assembly Public Bidding Valve Body Assemblyty-zs9bf4y-a3c 20" Cl300 A216-wcb/316+ Partial Su 2025-05-20
China Contract Awarded For: Sinopec Engineering Construction Co., Ltd. (first Re-engineering) Petroleum Reserve Tianjin Shihua Crude Oil Reserve Base Energy Expansion And Renovation Project Epc General Contracting Project Centrifugal Pumpvs4-2000~2800m3/h 17~2 2025-05-20
India Supply Of Kit For Set Of Bolts And Nut Of Supporting Device . M/s. Ftrtipl's Part No. 790727225 For Cbc Oflhb Coaches Comprising 05 Items. Details As Per Annexure -a [ Warranty Period: 84 Months After The Date Ofdelivery ] 2025-05-20
India Supply Of Plug - 2pt To Blw Pl.no. 18360075 #*. Plug - 2pt To Blw Pl.no. 18360075 And Emd Pt. No. 8270133 Or Similar (amphenol Part No. Ms3106a-10sl-4s ) Suitable For Etp Connector Of Wdg4/wdg4d Hhp Locomotives. [ Warranty Period: 30months After The Date 2025-05-20
Thailand Contract Awarded For: Announcement Of Winners, Bidding, Purchase Of The Cas Scifinder Discovery Platform Quoted Price: 840,270 Baht.announcement Of Winners, Bidding, Purchase Of The Cas Scifinder Discovery Platform 2025-05-20
India Supply Of Nose Cone For Memu Dmc 3-phase/bhel Coach #*. Nose Cone For Memu Dmc 3-phase/bhel Coaches, As Per Drawing: Em10266 Alt. 'nil' Without Item No 3 & 5 To 7 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-20
qty:9
>India
qty:9
>Supply Of P F Huts With Puf Panel (mha) (q3)
qty:9
qty:9
>2025-05-20
Whats app