Filter Search


Asia


Location Summary Deadline
India Kunnothparamba G P Parollathil Thalathil Road Tarring From Ch. 032 To 0/225 Km Pro, No.61/25 Ward No. 7 2025-08-13
India Re Etender Pallipady-kurumulloor Road Maintenance Ward11 Kanakkary Gp-pro..98/24-25 2025-08-13
India Supply Of Kit For D2 Relay Valve #*. Kit For D2 Relay Valve As Per Ftil Part Number 790018105 And D & M Part Number Rk Ab42-w1 Consisting Of 10 Items 13 Nos As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-13
India Supply Of Drilling Fixture For Cbc Coupler. #*. Drilling Fixture For Cbc Coupler As Per Frontier Drawing No. Fasl/cc/df/1676.the Material Should Be Supplied With Guarantee/ Warranty Certificate And Work Test Certificate, Make- Frontier. [ Warranty Period: 2025-08-13
India Supply Of Pressure Reducing Valve #*. Pressure Reducing Valve (fp-prv) To Kbi Part No. Ii77479/060a [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-13
India Supply Of Overhauling Kit For Pressure Reducing Valve (i71472/0800a/1136508/0800) Of Electric Ccb 2.0 Brake System, Kbi Kit No. Xki/ Kit/02482" Set Consisting Of 09 Items, Set Details Attached As Per Annexure-1 [ Warranty Period: 30 Months After The Date 2025-08-13
India Supply Of Set Of Overhauling Kit For Sander Isolat #*. Set Of Overhauling Kit For Sander Isolating Cock As Per Kbi Part No.(i76839) & Kbi Kit No.xki/kit/01584. Kit Consists Of 11 Items As Per Annexure Attached. [ Warranty Period: 30 Months After The Date 2025-08-13
India Supply Of Overhauling Kit For 3/2 Way Cocks #*. Overhauling Kit For 3/2 Way Cocks Of Sifa-21 / Percos As Per Kbil Part No.ii51450/2 & Kbi Kit No. Xki/kit/01582 Of Ccb System. Kit Consists Of 15 Items As Per Attached Annexure. [ Warranty Period: 30 Months 2025-08-13
qty:1
>India
qty:1
>Supply Of High End Office Table / Desk Furniture Set / Suit (q3)
qty:1
qty:1
>2025-08-13
qty:303
>India
qty:303
>Supply Of Work Books (preschool Kit) (q3)
qty:303
qty:303
>2025-08-13
Whats app