Filter Search


Asia


Location Summary Deadline
India Bulk Head Elbow (3/4 X Od X M26 X 1.5m) .#* Bulk Head Elbow (3/4 X Od X M26 X 1.5m ) As Per Drg No. Icf/std-3-5-113 Item 1 Alt.c Spec : Icf/md/spec-166, Latest Rev. [ Warranty Period: 48 Months After The Date Of Delivery ] ] 2025-08-31
India Repairs To School Building And Compound Wall Of Government Primary School Sal 2025-08-31
India Xlpe Cable For Working Voltages Up To And Including 1.1 Kv As Per Is 7098 (part 1) 2025-08-31
India Coupler Body For Transition Cbc To Rdso [w] Sk 62724 Item 18 Alt. 23 rdso Spec. No. 56-bd-07 Amd No.1 Of September 10. .#* Coupler Body For Transition Cbc To Rdso [w] Sk 62724 Item 18 Alt. 23 Rdso Sp ec. No. 56-bd-07 Amd No.1 Of September 10. [ Warranty P 2025-08-31
India Supply Of Set Of Labyrinth Ring For Nose Suspend Drive(msu Tube) Of Wap7/wag-9 As Per Elw/bsl/sketch No- Elw/bsl/3-ph/sk.no.502 (set Consists Of 10 Items, One No. Each Total 10 Nos.) [ Warranty Period: 30 Months After The Date Of Delivery ]set Of Labyrint 2025-08-31
India 2. Widening & Strengthening Work Of Chakia Madhurapur Path From Ch- 0+000 To Ch- 12+950 (total Length- 12.950 Km) Under Road Division Dhaka For The Year 2025-26 2025-08-31
India Pro.no 47 2024 25 Pushpagiri Palattikkund Link Road Reconcreting - Meloor Gp 2025-08-31
India Construction Of 8 (eight) Nos Deep Tube Well Under Nabard(ridf-xxvii) During The Year 2021-22 /sh_construction Of 2 (two) Nos Upvc Distribution System, Installation Of Submersible Pump-motor Sets And Other Allied Works During The Year 2024_25 For Dtw 2025-08-31
India Supply And Application Of Dust Suppressant / Additives For Dust Suppression 2025-08-31
India Construction Of Piped Water Supply Scheme At Mandavi Bk Tal Dhadgaon Dist Nandurbar 2025-08-31
Whats app