Filter Search


Asia


Location Summary Deadline
India Contract Award For: 1.construction Work With C C At (a) Batania Ali Ahammed Hojur Road. (b). Batul Nur Jama Mosque. (c).dula Mia Koviraj Bari Pond Side Road. Word- No-01 Construction Of Brick Drain At (a) Pourashava Office South Side & South Arjuntala Hig 2026-02-21
India Supply Of 312800170016: Fixture For Maintenance Of Bogie Sub-assembly (control Arm Dis-assembly From Bogie) For Vande Bharat Bogie As Per Rdso Spec.no: Rdso/pe/spec/emu/0196-2019(rev.01) As Per Medha Code: Spmaet18bogie1144. 2026-02-21
India Supply Of 312800160011: Fixture For Maintenance Of Traction Center Assembling In Position With Coach For Vande Bharat Bogie As Per Rdso Spec.no: Rdso/pe/spec/emu/0196-2019(rev.01) As Per Medha Code: Spmaet18bogie1143. (warra 2026-02-21
India Kits Of Knorr Bremse Make Ccb-ii System Of Electric Locomotives Consisting Of 02 items As Per Enclosed Annexure: (i) Set Of Base Gasket/o-ring Epcu (kbi Kit No: xki/kit/02826) (ii) Set Of Base Gasket/o-ring Of Aux. Manifold Valves (kbi Kit No: xki/kit/026 2026-02-21
India Cement Concrete Work Form Kulkarni Nagar Square To Shivshakti Nagar Culvert In Ward No. 24 Under Zone No. 06 (mahapor Nidhi) 2026-02-21
India Overhauling Kit For Unloader Valve .#* Overhauling Kit For Unloader Valve (1197710), Kbil Kit No. Xki/kit/01654 For 3-phase Electric Locomotive Wag9-hc. [ Warranty Period: 30 Mo nths After The Date Of Delivery ] ] 2026-02-21
India Supply Of Hydraulic Pump #*. Pump Motor Combination Oem:pl Part No:62.05.1000.338 Make:plasser ,rexroth ,danfoss [ Warranty Period: 18 Months After The Date Of Delivery ] ]double Pump Oem:pl Part No:hy806x38.17re Veljan-denison Part No. T6dc-038-017-3r02- 2026-02-21
India Supply Of Electric Driver Rotary Screw Compressor 300 Cfm 2026-02-21
India Removal Of Prosopis Juliflora For Replacement By Indigenous Species Work At Khol Block #*. Removal Of Prosopis Juliflora For Replacement By Indigenous Species Work At Khol Block Rewari Range 2026-02-21
India Removal Of Prosopis Juliflora For Replacement By Indigenous Species Work At Bawal Block #*. Removal Of Prosopis Juliflora Work At Bawal Block 2026-02-21
Whats app