Filter Search


Asia


Location Summary Deadline
India Design, Manufacturing, Supply, Installation, Testing & Commissioning Of Electric Overhead Travelling Crane (eot) 3 Ton Capacity As Per Attached Technical Specification No. Sr.dme/dsl/gtl/eot-3t/remote/2023 Rev-0. 2025-10-11
India Supply Of Set Of Must Change Maintenance Spares Fo [set Of Must Change Maintenance Spares For M/s. Ftil Make Complete Air Generation & Treatment Unit (agtu With Oil Free Main Air Compressor & Air Drier ) For Mrvc Iibt Emu Rake & Medha Rake As Per Annexure 2025-10-11
India Annual Plan- Kuzhalmannam Gp 2024-25 Proj No 6 Kunduparamb Road Retaring-general Civil Work 2025-10-11
India Annual Plan-kuzhalmannam Gp 2024-25 Proj No 44-kunnuparamb Road Retaring-general Civil Work 2025-10-11
India Annual Plan-kuzhalmannam Gp 2024-25 Projno 45 Mutharamkkavu To Mootrad Road Re-tarring 2024-25-general Civil Work 2025-10-11
India Supply Of 382101450012: Stopper/ Wedge Stop For Bfat Wagon As Per Drawing No- Tp/dw-9701-s-17 Alt-01 Or Latest Item No-02&03 (01 Set Consist Of 01 Wedge Stop Front (item No 02) And 01 Wedge Stop Rear (item No 03 )). 2025-10-11
India Supply Of 200005500013: Complete Brake Gear Arrangement For Wag-7 Locos To Clw Drg. No. 06/1/19/108 Alt-4 (sheet No. 1) And 06/2/19/108 Alt. Nil (sheet No. 2). Complete Arrangement Consisting 66 Items 525 Nos As Per Enclosed 2025-10-11
India Supply Of 231605100010: Pressure Governor (mcp Cut In/cut Out), Kbi Part No. I84649/10080. 2025-10-11
India Supply Of 234500130022: Maintenance Kit For Cgr Consisting Of 09 Items. Bt Part No. Aal Part No Qty. Insulating Bush S-2502 G- 2502 01 No. Bush S-2503 G-2503 01 No. Stud M-6 S-2504 G-2504 01 No. Insulating Washer S-2505 G-25 2025-10-11
India Supply Of 460152532163: Supply Of Hv Bushing 145 Kv,800a For Bhel Make 21.6/30.24 Mva Power Transformer As Per Rdso Spec. No. Ti/spc/ Psi/trnpwr/ 3201 With A And C-1 Or Latest, Make: Bhel Only 2025-10-11
Whats app