Filter Search


Asia


Location Summary Deadline
India Construction Of Strong Room For Sub Treasury, Bonai In The District For The Year 2024-25. 2025-07-10
India Supply Of 725804430277: Supply And Installation Of Solar Operated Cloud Base Anemometer Including Smart Iot With Remote Logging And Alerts As Per Specification (annexure - A) Attached. Make Brand: Kp Infratech Or Eltech Mak 2025-07-10
India Supply Of 79331026: Pillow Cover White Handloom To Is. 745/1990 Variety No 12. Size 72 X 46 Cms (inner Size), Flip Open Model, Screen Printing Of "southern Railway With Date Of Manufacturing" In A Strip Of Size 1 Cms Wid 2025-07-10
India Supply Of 79331026: Pillow Cover White Handloom To Is. 745/1990 Variety No 12. Size 72 X 46 Cms (inner Size), Flip Open Model, Screen Printing Of "southern Railway With Date Of Manufacturing" In A Strip Of Size 1 Cms Wid 2025-07-10
India Supply Of 522000420521: "supply & Installation Of Smps Based Integrated Power Supply System (ips) As Per Rdso Specification No. Rdso/spn/165/ 2023 Ver. 4.0 Or Latest Along 110 V, 300 Ah,low Maintenance Batteries As Per Rds 2025-07-10
India Supply Of 671202380020: Heavy Duty Solid Rubber Wheel, Size- 12-inch X 3-inch X 32mm. Bore Fitted With C.i. Bush 3-inch Dia, Bore Length From End-to-end 86mm, Wheel Should Be Cut Mark Type Bounded, Rubber Hardness 70 To 80 D 2025-07-10
India Supply Of 43059922: Feeder Contactor Voltage Rating 750 Vac Main Pole 4 Nos , Control Voltage 110v Ac 50-60 Hz With Surge Suppessor, Iec/en 60947-4-1 For Net 1&2 , Suitable For Set Of Panels For Lhb Eog Non Ac Coaches. M 2025-07-10
India General-kyip- Acp( Np )2024-25-urgent Works For Jungle Clearan And Silt Removal Of All Distributaries And Field Bothies Of Azhiyur Branch Canal-general Civil Work 2025-07-10
India Tn04-01 Sadp-2024-25-sungarahalli 2025-07-10
India General-maintenance Of District Co-operative Audit Joint Director Office, Idukki, Painavu-maintenance Of District Co-operative Audit Joint Director Office, Idukki, Painavu- General Civil Work 2025-07-10
Whats app