Filter Search


Asia


Location Summary Deadline
India Purchase Of Flow Cytometry Reagents In The Dept Of Pathology 2025-10-02
India General Budget 2024 25 20 Provision Improvements To Kolayad Town Work General Civil Work 2025-10-02
India Supply Of 3-phase Traction Motor #*. 3-phase Traction Motor Im3601az For Air Condition Bhel Emu Consisting Of - A) Bhel Make Traction Motor Type Im3601az With Pinion, B) Gearcase, C) Nsu (steel And Rubber Part), D)leather Bellow [ Warrantyperiod: 30 Month 2025-10-02
India General- Annual Plan 1581/dp Ekm/23-24- Improvements Of Kadiyolpuncha Ekkanam Padashekharam Thodu In Aikkaranad Gp - General Civil Work 2025-10-02
India Construction Of Concrete Paving For Kattilangadi Juma Masjid Road Ward 12 Athavanad Gp Proposed By Honble Mp Sri E T Mohammed Basheer Ls Ponnani. 2025-10-02
India Deposit- Construction Of Sewage Collection #*. Deposit- Construction Of Sewage Collection Tank ,sewage Pump ,rain Water Harvesting Tank, Under Ground Water Tank To Multipurpose Block Of Mananthavady District Hospital -work- General Civil Work 2025-10-02
India Selection Of Bus Operator For Procurement, Operations And Maintenance Of 300 Nos. Of Intra City Midi Non Ac Cng Buses On Ncc Model In Bhopal Third Call 2025-10-02
India Supply Of Micro Controller Based Electronic Speed Indicating #*. Micro Controller Based Electronic Speed Indicating, Recording System Type Mrt 918(paperless Type) Confirming To Rdsospecification No. Mp.0.3700.07(rev.07) August 2017. Each Set Consisting Of 2025-10-02
India Supply Of Traction Inverter Cooling Blower With Motor For Medha Ac-ac Control System To Medha Part No. Sp696901012. Suitable For Hhp Locomotives. #*. Traction Inverter Cooling Blower With Motor For Medha Ac-ac Control System To Medha Part No. Sp696901012. 2025-10-02
India Supply Of Lcmaip10-3 Module Assembly To Medha Pt.no: Sp696101010 For Hhp Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-02
Whats app