Filter Search


Asia


Location Summary Deadline
India Supply Of Locking Bracket For Cut Off Angle Cock To Rdso Drg. No. Wd-08008-s-20, Item No. 3, Alt. 03. #*. Locking Bracket For Cut Off Angle Cock To Rdso Drg. No. Wd-08008-s-20, Item No. 3, Alt. 03. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-07-01
India Supply Of Cable Resistance Thermometer Sensor... #*. Cable Resistance Thermometer Sensor 2xpt 100 Having Max Measuringcurrent 5ma And Measuring Range - 30 C To 250 C As Per Ruster Type No 21f.6x77.3.2pt -2.0.3,5sds-03 Or Temperature Sensor Of M/s B.g.indu 2025-07-01
India Supply Of Duster Cotton Khadi White 61 X 61 Cms, Hammed On All Sides Ir Totem. To Be Marked With Indelible Ink On Each Corner. To Drawing / Specification Is: 3777- 2019 (2nd Revision). #*. Duster Cotton Khadi White 61 X 61 Cms, Hammed On All Sides Ir Tote 2025-07-01
India Supply Of Stainless Steel Flange A20 For 20 Nb Pipe #*. Stainless Steel Flange A20 For 20 Nb Pipe Conforming To Rdso Spec.no. 04-abr-2002, With 8 Amendment Issued In Sept. 2016 To Rcf Drg No. Cc-36674, Alt : Nil. [ Warrantyperiod: 30 Months After The Date 2025-07-01
qty:14000
>India
qty:14000
>Supply Of Cold Drawn Seamless Steel Pipe St 35 As Per Din 2391/c Normalised (nbk) Galvanised And Yellow Passiv
qty:14000
qty:14000
>2025-07-01
India Supply Of Saddle As Per Icf Drg. No.emu/m-0-5-006 Alt.q/2 For Conventional Motor Coaches. #*. Saddle As Per Icf Drg. No.emu/m-0-5-006 Alt.q/2 For Conventional Motor Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/- 2025-07-01
India Cfr Make Spares And Consumables #*. Cfr Make Spares And Consumables/ As Per Tender 2025-07-01
qty:10
>India
qty:10
>Supply Of Server (q2)
qty:10
qty:10
>2025-07-01
India Dhule/ Dmc/wd/dmc Fund/148/5-11/2022-23 Construction Of Cement Concrete Road From1) Shri Nerkar Houseto Shri.bhadane House 2) Shri.bhadane House To B.g. Patil House At Shaskiy Vasahat In Pr.no.5,deopur,dhule. 2025-07-01
India Ranoli Construction Of Ipb ... 2025-07-01
Whats app