Filter Search


Asia


Location Summary Deadline
India Supply Of Modified Elastomeric Pad Complete #*. Modified Elastomeric Pad Complete To Rdso's Drg. No. Wd-95005/s-1, Alt. No. 7 (seven) And Rdso's Specn. No. Wd-20-misc-95 (rev-4) With Amendment Slip 01, Along With Rev 03 With Amendment Slip 06. [ Warranty 2025-06-30
India Supply Of Modified Elastomeric Pad Complete #*. Modified Elastomeric Pad Complete To Rdso's Drg. No. Wd-95005/s-1, Alt. No. 7 (seven) And Rdso's Specn. No. Wd-20-misc-95 (rev-4) With Amendment Slip 01, Along With Rev 03 With Amendment Slip 06. [ Warranty 2025-06-30
India Supply Of 38100538: Shackle Lock For Centre Pivot Assembly To Drg. No. Wd-85079/s-2, Alt-27, Item 7. Firm's Offer: Marking And Month Of Manufacturing Will Be Tagged On Induvisual Bags. Make: Ptl 2025-06-30
India Supply Of 25942943: Commutator Assembly Complete Including Steel Parts For Hitachi T. M. Armature As Per Clw Drg. No.2twd.095-045 Rev-1 And Specification No.4tms.095-034,rev.4 2025-06-30
India Supply Of 79906059: Fire Retardant Curtain Fabric Cloth For (2 Tier / 3 Tier) Ac Coaches As Per Rdso's Spec. No. C-9911 (rev.3) Of February 2005 With 6 Amendments -last Amendment Slip No.6 Of August 2016 & Corrigendum No 2025-06-30
India Supply Of Foot Step For Side Operates #*. Foot Step For Side Operates To Rdso Drg. No.- Wd-80007-s-10 Alt-25 Or Latest Item-34 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po V 2025-06-30
India Supply Of Set Of Non-metallic Pipe #*. Set Of Non-metallic Pipe (smoke Detector Pipe) For Wag-9hc Locomotive Toclw Specn. No. Clw/es/3/0254/b Or Latest (set Details As Per Annexure Uploaded) [ Warranty Period:30 Months After The Date Of Delivery ] 2025-06-30
India Supply Of Fire Clay Mortor For Laying Fire Clay Refractory Bricks Grade-2 To Is 195/2005.re-affirmed 1997 (with Up To Date Amendment) #*. Fire Clay Mortor For Laying Fire Clay Refractory Bricks Grade-2 To Is 195/2005.re-affirmed 1997 (with Up To Date Amen 2025-06-30
India Supply Of Switching Element Complete, #*. Switching Element Complete,bt Part No.s 2450, Aal Part No.g-2450 Bt Part No.s 2450,aal Part No.g-2450 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-30
India Supply Of Clay Graphite Stopper #*. Clay Graphite Stopper As Per Specification No. Rwf/m/specn-1/019/1988 Alt 'm' And Drawing No.c/mo-16/13 Alt 'h'. Note: Invitation Of Tender And Procurement Are From Manufacturers Having Manufacturing Facilities/plant In 2025-06-30
Whats app