Filter Search


Asia


Location Summary Deadline
India Supply Of Zonal Rate Contract For Supply Of ( Ph No.:15027) Inj. Turoctocog Alfa Pegol 500 Iu (glycopegylated Extended Halflife Recombinant Fviii 500 Iu) #*. ( Ph No.:15027) Inj. Turoctocog Alfa Pegol 500 Iu (glycopegylated Extended Halfliferecombinant Fv 2025-09-12
India Supply Of Labyrinth Ring Ls-ws Ral 9005 #*. Labyrinth Ring Ls-ws Ral 9005 Of M/s Bombardier Part No. 3ejd000001- 0830. Specn: Ls-ws Ral 9005 Of M/s Bombardier Part No. 3ejd000001- 0830. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-09-12
India Modernization Of Bus Stand Thittuvilai Bus Stand Shopping Complex Ward No 5, Survey No 832 Knmt Work 2025-09-12
India Jal Jeevan Mission-jjm #*. Jjm-last Mile Connectivity-retrofitting Of Schemes Fr Providing Functional House Hold Tap Connections (fhtc) From The Existing Completed Schemes In Cheranelloor Pachayath And Replacement Of Old , Obselete And Damaged Pipes- P 2025-09-12
India Supply Of Merged Beckman Coulter Items #*. Ast R1 4 X 6 Ml, R2 4 X 6 Ml For Beckman Coulter Au 480 Of 840 Test Kit (1 No.=1 Kit) ]pinch Valve Tubing (pkg Of 2) For Beckman Coulter Au 480 ]ck (nac) R1- 1 4 X22 Ml, R1- 2 4 X 4 Ml, R2 4 X 6 Ml For Beckman Co 2025-09-12
India Supply Of Tab Ribociclib 200 Mg #*. Tab Ribociclib 200 Mg ]tab Ribociclib 200 Mg ]tab Ribociclib 200 Mg ] 2025-09-12
India Maintenance Of Switchyard And Transformer Yard Areas (22 Acres Approximately) At 220kv Substation 66kv Substation Ggsstp 2x850kw Microhydel Project And Transformer Yard Areas Of 4 X 210 Mw Units Ggsstp Roopnagar As Per Scope Of Work 2025-09-12
India Annual Maintenance Of Mla Hostel At Capital Complex, Agartala Under Capital Complex Division, Pwd(building) During The Year 2024-25. 2025-09-12
India Supply Of Transparent 2 Layer Pouches And Rolls. 2025-09-12
India Providing Of 10 Nos Of Man Power For Housekeeping And Maintenance And 10 Nos For Work In Various Section At Dcpp Ammapalayam For 12 Months For The Year 2024 2025. 2025-09-12
Whats app