Filter Search


Asia


Location Summary Deadline
India Construction Of Block Public Health Unit In Phc Bollapalli In Bollapalli (m) In Palnadu District 2025-05-15
India Intensive Patchwork For Surface Damages From Km 6/2 To 8/4 & 9/2 To 10/4 Of Tarigonda - Sarimadugu Road In Annamayya District 2025-05-15
India Construction Of Rcc Hydrant Post With Platform Inc Necessary Extension Of Di Pipe Line Marking Of Individual Fhtc, Etc. Complete At East Site Of Manu River Under Dws Sub-division, Kumarghat, Unakoti Tripura Gr-i 2025-05-15
India Intensive Patchwork For Surface Damages From Km 0/2-4, 1/0-8 & 2/2-3-2 Of Mt Road To Renimakulapalle Road In Annamayya District 2025-05-15
India Construction Of Pump House Inc Providing And Laying Distribution Of Pipeline At Nc Para Under East Raitwisa Vc Inc Providing, Installation And Commissioning Of 2500 Gph Package Type Iron R3emoval Plant Complete At Jogarai Para Under Dws Sub-division 2025-05-15
India Construction Of 02 Two Nos Innovative Scheme Inc Construction Of Brick Masonry Well At Kachari Cherra And Bathakrai Under Deo-valley Vc Within The Jurisdiction Dws Sub-division, Kumarghat 2025-05-15
India Construction Of Block Public Health Unit In Phc Dachepalli In Dachepalli (m) In Palnadu District 2025-05-15
India Urgent Repairs To Surface Damages From Km 0/0 To 5/0 In Anantapur - Palamaneru Road To Bommanacheruvu Via Bandakindapalle, Adavilopalli Road In Annamayya District 2025-05-15
India Construction Of Block Public Health Unit In Phc Edlapadu In Edlapadu (m) In Palnadu District 2025-05-15
India Protection Work At Uttar Maharani Bazar To Asharamkobra (l-0.45 Km) Under Mungiakami Rd Block #*. Brick Bats Wirecrates, C.c Block And Construction Of Embankment Etc. At Ch. 0.390 Km During The Year 2024-25 2025-05-15
Whats app