Filter Search


Asia


Location Summary Deadline
India Supply Of Coupler Body With Shank Wear Plate #*. Coupler Body With Shank Wear Plate (welded In Position) For Transition Cbc To Rdso Drg. No. Sk-62724 Alt-28, Items No. 18 & 10. Other Technical Conditions Conforming To Str No. 56-bd-2007 Read With All Amen 2025-05-15
India Engaging Of Cng Truck (tata-407) Or Equivalent With Driver And 2 Labours For Day To Day Maintenance Work Ward No. 143 (sidharth Nagar), Central Zone (balance Work) 2025-05-15
India Supply Of Hanger Block For Bolster Suspension To Rcf's Drg. No. Cc05106, Alt.no, -e And Rdso's Str No.c-k 202 With Amendment Slip No.-1 Of August, 2002. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Cate 2025-05-15
India Supply Of Set Of Door Cutout For Amrit Bharat Non Ac Pantry Car Coaches. #*. Set Of Door Cutout For Amrit Bharat Non Ac Pantry Car Coaches. As Per Drawing: Mp24dccbab Version 0, Packing Instruction: No Special Packing Required. The Protruding, Threaded Po 2025-05-15
India Supply Of Centre Pivot Top For Casnub #*. Centre Pivot Top For Casnub 22 Hs Bogie To Rdso Drg. No. Wd-97049-s-3, Alt. No.10, Item No.2 & Other Technical Requirements Conforming To Specification. No.wd-17-casnub-22 Hs Bogie Rev 03, Readwith All Amendments, 2025-05-15
India Supply Of Oil Pump For Converter - Canned Motor Pump #*. Oil Pump For Converter - Canned Motor Pump Model Ba32-125/1.8h/rc/02, 1.8 Kw Of M/s. Flowwell Or Similar Suitable For Bhel Make Igbt Converter [ Warranty Period: 30 Months After The Date Of Delivery 2025-05-15
India Supply Of Overhauling Kit For Lru, Control Portion; Er 787776-1994 (er-cp) #*. Overhauling Kit For Lru, Control Portion; Er 787776-1994 (er-cp) Of M/s. Knorr-bremse Ccb Asper Annexure [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-15
India Supply Of Overhauling Kit For Lru, Control Portion; Bp 787321-1994 (bp-cp) #*. Overhauling Kit For Lru, Control Portion; Bp 787321-1994 (bp-cp) Of M/s. Knorr-bremse Ccb Asper Annexure [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-15
India Supply Of Thrust Coller As Per Drg.no. 9544046 Alt Ca Specn: Purchase Specification No.misc.534 Rev.nil [ Warranty Period: 30 Months After The Dateof Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted 2025-05-15
India Supply Of Led Based Twin Beam Head Light For Wag-9, Wap-7 & Wap-5 Locos To Specn No:rdso/2017/el/spec/0134 (rev-02) [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-15
Whats app