Filter Search


Asia


Location Summary Deadline
Bangladesh (a) Improvement Of Subil Gps -engr. Suzon House Via Taher Pollice House Road At Ch. 00-450m (road Id: 419405131); (b) Construction Of 104m Protective Work On The Same Road; (c) Construction Of 1x1.50x1.50m 1 No. Culvert At Ch. 182m On The Same Road Under 2025-05-15
India Construction Of Health Sub Centre Rana Bandh, Panchayatharipur Block- Raneshwar, Dumka 2025-05-15
India Supply Of Pri Damper Bkt #*. Primary Damper Bracket-(qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: 1267711 Ver. 01r, Packing Instruction: Suitably Packed In Jute Bags [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-15
Bangladesh Construction Of Rcc Drain And Ancillary Works Along The Existing Boundary Wall At North Side Of Laldia Char-2, Patenga, Chattogram. 2025-05-15
India Supply Of Regulating Equipment (atd) - Three Pulle #*. Regulating Equipment (atd) - Three Pulley Type With Modified Pulley Groove (3:1 Ratio) (with Useof Nbc Ball Bearing 6305 Llu (part-i) Or Skf Ball Bearing 6305-2 Rs1 (part- I) Or Fag Ball Bearing 6305- 2025-05-15
India Supply Of Regulating Equipment (atd) - Three Pulle #*. Regulating Equipment (atd) - Three Pulley Type With Modified Pulley Groove (3:1 Ratio) (with Useof Nbc Ball Bearing 6305 Llu (part-i) Or Skf Ball Bearing 6305-2 Rs1 (part- I) Or Fag Ball Bearing 6305- 2025-05-15
India Supply Of Upper Stop Plate #*. Upper Stop Plate As Per Drg.no.1268366, Ver.02r1. Packing Instruction - Spi001 (usp) [ Warranty Period: 84 Months After The Date Of Delivery ] 2025-05-15
India Supply Of Cross Section #*. Cross Section-(qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: 1267405 Ver. 02r1 And Mdts 150 Rev. Nil Or Latest & Mdts 166 Rev. 1 Or Latest, Packing Instruction: No Special Packing Required [ Warran 2025-05-15
India Supply Of Enamel,synthetic, Exterior, Finishing Traffic Blue #*. Enamel,synthetic, Exterior, Finishing ` Traffic Blue To Isc:169 Of Is:5/2007(ra- 2022) To Spec.is:8662/04 (ra-2019) Or The Latest And Icf/md/spec- 045, Issue Status 2, Rev.03 With Amdt. Dt. 2025-05-15
United Kingdom Consulting, General Services Energy Efficiency And Integration Of Renewable Energies Into The Grid In Bangladesh 2025-05-15
Whats app