Filter Search


Asia


Location Summary Deadline
India Repair Work Of J.a.p Barrack 2 And Kara Hospital At Sub Jail Ghatshila In The District Of East Singhbhum. 2025-06-03
India Power Supply Of 5 Kw Load To Rural Piped Water Supply Project To Village Sudarsanpur Under Thakurmunda Block (ombadc) 2025-06-03
India 1. Construction Of 1. Construction Of Aganwadi Centre At-kanidih, G.p.-barjora, Block-jamtara, Dist.-jamtara 2. Construction Of Aganwadi Centre At-gopalpur, G.p.-udalbani, Block-jamtara, Dist.-jamtara, Gr. No.-02 2025-06-03
India Contract For Power Supply Of 5 Kw Load To Rural Piped Water Supply Project To Village Daunikila Under Thakurmunda Block (ombadc) 2025-06-03
India Power Supply Of 5 Kw Load To Rural Piped Water Supply Project To Village Laxmiposi Under Thakurmunda Block (ombadc) 2025-06-03
India Supply Of Vertical Damper #*. Vertical Damper Capacity 400 Kg For 1400 Hp Demu/dpc To Icf Drg. No. Dmu/dpc5-0-5-503 Alt. K/6, Item No. 1.confirming To Rdso Spec. C-8703 Rev-3. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-03
India Contract For Power Supply Of 5 Kw Load To Rural Piped Water Supply Project To Village Raipada Under Thakurmunda Block (ombadc) 2025-06-03
India Construction Of Pcc Road From Bansdih Kalan Main Road Sanjay Yadav House (length-0.440 Km.) 2025-06-03
India Power Supply Of 5 Kw Load To Rural Piped Water Supply Project To Village Tikasil-ii Under Karanjia Block (ombadc) 2025-06-03
India Construction Of Pcc Road From Ketar Kandi Mukhya Path To Mukundpur Narayan Van Surya Mandir (length-0.560 Km.) 2025-06-03
Whats app