Filter Search


Asia


Location Summary Deadline
India Construction Of Toilet At Regional Store Under Lakhanpur Area 2025-05-31
India Re-excavation And Beautification Of Mallik Bandh At Mouza-tilaghagri, J.l. No.-78, Fulmoli Gp, Under Taldangra Block Under 15th Fc Tied Fund Under Bankura Zilla Parishad.(2nd Call Of Nit-32, Sl-8) 2025-05-31
India Completion Of Kottapuram Sub Centre (electrification)-general Electrical Work- Paravur Municipality 2023-24 227/23-24 (retender) 2025-05-31
qty:1000
>India
qty:1000
>Supply Of Horse Ration (jav) (q4)
qty:1000
qty:1000
>2025-05-31
India 540-25 Construction Of Retaining Wall And Slab Work In Moorthipadi Drainage #*. Construction Of Drainage 2025-05-31
India Mla-sdf-mla Sdf 2022-23 Peerumade Lac Kumily Gp -mullayar Estate Road Culvert Construction #*. Culvert Construction 2025-05-31
India Vaikom B.p-2024-25- Proj.no.13/24-vechoor Mattam Koduthuruth Devasyamkari Bhagam Road Maintanance Vechoor Gp #*. Refer The Schedule 2025-05-31
India Vaikom Bp 2024-25_ 184/25- Construction Of Thayakkadu - Mozhikkodu Temple Road Drain In T V Puram Gp #*. Refer The Schedule 2025-05-31
India Supply Of Heavy Duty Storage Racks #*. Supply Of Heavy Duty Storage Racks Of Size: 3000w X 750d X 2700h As Per The Detailed Specification & Drawing Attached. [ Warranty Period: 24 Months After The Date Of Delivery ] ]supply Of Heavy Duty Storage Racks Of 2025-05-31
India Supply Of Set Of Items For S-trap Arrangement For Bolted Design Ir-drdo Smaller Bio Digester (for Non-cbc Fitted Coaches). 1)rubber Hose, Nominal Dia. 70, Type B, Length = 375 Confirming To Specification No. Is:14933-2001 And To Rdso Drawing No. Cg-16008, 2025-05-31
Whats app