Filter Search


Asia


Location Summary Deadline
India Property Development At Botanical Garden Metro Station Of Line-3. 2038-11-17
India Borrowing Of Rs. 1500 Crore Through Long Term Loan From Banks/financial Institutions 2038-12-05
India Electronic Weigh Bridge Site M.c. 2038-12-08
Norway Contract Awarded to develop a new transport network, including 500km of subsea pipelines, so that 16bn cubic metres of gas will be delivered through over 3500km of pipelines through Azerbaijan, Georgi 2038-12-31
Qatar Supply Deal For Liquefied Natural Gas (lng) With Bangladesh's State-owned Petrobangla For 1.8 Million Tonnes A Year 2038-12-31
Korea Republic of To Build A New Beltway Project For Kazakhstan’s Capital, Almaty. 2038-12-31
India Supply Of Running Contract For Procurement Of Glued Insulated Rail Joints. #*. Glued Insulated Rail Joints G-3(l) For 52 Kg Rail With 6 Mm Thick End Post To Rdso Drg. No. T-671 And Specification As Per Irs/manual Ofglued Insulated Rail Joints (1998) Corri 2039-01-02
India Survey, Investigation, Engineering Procurement, Design, Constructing And Completing The Facilities To Reach The Treated Effluent Up To The End User From Outlet Of 245 Mld Stp And Sale Treated Effluent For Irrigation, Industries And Other Non-domestic 2039-01-09
India Leasing Out Of Cold Storage Cum Pack House At Jind. 2039-01-15
India Property Development At Kirti Nagar Metro Station (line-3). 2039-01-15
Whats app