Filter Search


Asia


Location Summary Deadline
India Construction Of 220 Kv D C Line From Loc No 27 I E Of Lilo Of 220 Kv Dc Dhauliganga Pithoragarh Pgcil Line At 220 Kv Gis Baram To 400 Kv Substation Pgcil Jauljivi 2025-05-31
India Work Of Boys Hostel At Villupuram 2025-05-31
India Procurement Of Inline Double Head Disc Type Counting Machine Integrated With Pasaban Cross Cutter 2025-05-31
India Construction Of Ipb Chowk And Shed At Village Mandholi Kalan Block Behal 2025-05-31
India Construction Of Cd Work #*. Construction Of Cc Road, Rcc Drain. 2025-05-31
India Supply Of Constant Contact Polyurethane Side Bearer Pad Assembly #*. Constant Contact Polyurethane Side Bearer Pad Assembly For Casnub 22hs Bogies To Firm's Drg.no.aal-021101,alt.8, Spec. Design 'a' Of Rdso Spec.no. Wd-38-misc2004 Rev.2 Of Nov.2022. [ War 2025-05-31
Bangladesh Re-sectioning Of Embankment With Slope Protection (length = 2.700 Km) Within Km. 71.290 To Km. 74.080 Of Polder No. 56/57 & Construction Of Drainage Structure (4-vent Cum Navigation Lock) At Lalmohan 2025-05-31
Bangladesh Rehabilitation Of Embankment From Km 21.800 To Km 29.400 = 7.600 Km And Construction Of Submersible Spur (15 Nos), Drainage Structure (1-vent), Drainage Outlet (1 No), Observatory Tower & Change Room 2025-05-31
Bangladesh Re-sectioning Of Embankment With Slope Protection (length = 0.500 Km) And Construction Of Drainage Structure (10-vent Cum Navigation Lock) Within Km 81.080 To Km 81.580 Of Polder No. 56/57 At Lalmohan 2025-05-31
Bangladesh Re-sectioning Of Embankment With Slope Protection (length = 2.080 Km) Within Km 64.980 To Km 67.290 Of Polder No. 56/57 & Construction Of Drainage Structure (2-vent) At Lalmohan Upazila Of Bhola Distr 2025-05-31
Whats app