Filter Search


Asia


Location Summary Deadline
India Supply Of 75540745: Mat Door Coir 915 X 610 Mm [3'x2'] Designation Br 8 Is Specn No. 11420art.iv/1985. Type: Stenciled As "scr" In Contrast Colour. Make /brand: Ccm 2025-05-30
India Supply Of Ball Joint Roll Link Flexible Joint #*. Ball Joint Roll Link Flexible Joint(anti Roll Bar Link) Drg No.c53973 Reb Bred 8416 Rev"3r3%u201d As Per Technical Specn. No. 17.531.100.03, Technical Specn. No. 17.617.100.02 And Mdts - 148 Rev-01 , Mdts 2025-05-30
India Supply Of Lower Bearing Housing #*. Lower Bearing Housing (fabricated Design). Drawing No.: S.e.rly's Drg. No. Kgp-1836, Alt. Nil. Material Specification: Is: 2062 / 2011, Amnd.1 Of November 2012, Gr. E250c. [ Warranty Period: 30 Months After The Date Of 2025-05-30
India Supply Of Electronic Rectifier Cum Regulator Unit (erru) For 4.5 Kw Capacity Alternator Suitable For Use In 110v Dc Train Lighting System, As Per Rdso Specification No Rdso/pe/spec/ac/0013- 2011(rev-3). #*. Electronic Rectifier Cum Regulator Unit (erru) F 2025-05-30
India Supply Of Braided Hose Pipe With Synthetic Fibre Textile Of Different Size. #*. Braided Hose Pipe 31.5 Mm Nominal Bore In Standard Lengths Of 15 Mtrs. ( Braided Hose Pipe With Plain Nonfluted Surface & Braided Textile Reinforcement With Synthetic Fibre) F 2025-05-30
India Supply Of 33500022: Ball Joint Roll Link Flexible Joint(anti Roll Bar Link) Drg No.c53973 Reb Bred 8416 Rev"3r3%u201d As Per Technical Specn. No. 17.531.100.03, Technical Specn. No. 17.617.100.02 And Mdts - 148 Rev-01 , 2025-05-30
India Supply Of Maintenance Kit-02 For Earthing Equipment #*. Maintenance Kit-02 For Earthing Equipment. Each Set Consists Of 5 Items As Per Annexure Attached [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Cate 2025-05-30
India Supply Of Primary Current Transformer (pos. No. 6.1) #*. Primary Current Transformer (pos. No. 6.1) As Per Spec. No. Clw/es/3/0013 Alt-b Or Latest And Abb Doc. No. Hbtb585560r0021 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-30
India Supply Of Primary Current Transformer (pos. No. 6.1) #*. Primary Current Transformer (pos. No. 6.1) As Per Spec. No. Clw/es/3/0013 Alt-b Or Latest And Abb Doc. No. Hbtb585560r0021 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-30
India Supply Of Foot Step For Side Operates #*. Foot Step For Side Operates To Rdso Drg. No.- Wd-80007-s-10 Alt-25 Or Latest Item-34 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po V 2025-05-30
Whats app