Filter Search


Asia


Location Summary Deadline
India Supply Of Door Hand Hold For Boxn Wagon #*. Door Hand Hold For 'boxn' Wagon To Irs's Drg. No.w/ml-6,alt. No-3 (three) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Blower Complete With Motor (mvsl) 2.2 Kw #*. Blower Complete With Motor (mvsl) 2.2 Kw As Per Clw Spec Clw/es/b14 Alt-c And To Rdso Spec E-10/3/08 Revised September 95 With Ammendment No 1 & 2 [ Warranty Period: 30 Months After The Date Of Delive 2025-05-30
India Supply Of Sub Kit Poh -5-manual Hand Drive With Operating Handle #*. Sub Kit Poh -5-manual Hand Drive With Operating Handle To M/s. Anantashree Part No. G 42 Or M/s. Repl Part No.s 42 Or Rdso Drg.no. Skel-4625 Consisting Of 01 Item/01 No. [ Warranty Perio 2025-05-30
India Supply Of Sub Kit Poh -5-manual Hand Drive With Operating Handle #*. Sub Kit Poh -5-manual Hand Drive With Operating Handle To M/s. Anantashree Part No. G 42 Or M/s. Repl Part No.s 42 Or Rdso Drg.no. Skel-4625 Consisting Of 01 Item/01 No. [ Warranty Perio 2025-05-30
India Supply Of Shaft Rocker Arm Dlw P.t.no.16210013 #*. Shaft- Rocker Arm To Dlw.drg.no. 8028460 Alt. "aab" (dlw Pt.no.16210013) With Dlw Pt.no.40066418-a, Specs:- Cp-5-9 . [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Slip Free Stainless Steel Chequered Sheet. #*. Slip Free Stainless Steel Chequered Sheet 1.25 X 1250 X 3100 Mm., As Per Drawing/specification: Is:6911-92, Grade 304 S1,finish 2b.detail Of Chequres,(i) No Of Chequres 16-20 Per 100x100 Sq. Mm Area 2025-05-30
India Supply Of Frlt Cotton Insulation Tape #*. Frlt Cotton Insulation Tape Conforming To Icf Specification No. Icf/elec-921 Rev.0.cs.5 Note: 1. Non Adhesive Side Of The Tape Shall Be Of Green Colour 2. Supplier Shall Print Rly-rly In Generic Pattern On Non Adh 2025-05-30
India Supply Of S & I Of Cattle Guard Assembly #*. Supply And Installation Of Cattle Guard Assembly Icf/mrvc/d/ss-2-6-001 Alt 'c' Col.i. Special Condition : 1. Installation Is Required As Per Assembly Drawing. 2. For Installation Annexure-a, Dtd 13-09-2023 To B 2025-05-30
India Supply Of Side Bearer Cover #*. Side Bearer Cover To Drg.no.56711005, Col.i, Alt 'a'.- [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs] ] 2025-05-30
India Supply Of V-deep Groove Axle Pulley For 4.5 Kw Brushless Alternator Conforming To Rdso Specification No : Elps/spec/tl/13 March 1998 And Rdso Drg. No. Skel-3883, Alt.- 5 (for 16.25 Ton Axle). [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
Whats app