Filter Search


Asia


Location Summary Deadline
India Supply Of Seat Cum Back Rest Pressing To Icf Drg No. Emu/m2-6-1-507 Alt N/12 #*. Seat Cum Back Rest Pressing To Icf Drg No. Emu/m2-6-1-507 Alt N/12. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Exterior Epoxy Pu Paints #*. Supply And Application One Coach Set Of Exterior Epoxy Pu Paints For Spicac Coaches To Drg.no.800-8-3-003, Alt-nil As Detailed Below: 1.epoxy Zinc Phosphate Primer (twopack) Specn .rdso /m&c/pcn/100/ 2018, Chapter-ii 2025-05-30
Bangladesh Construction Of Rcc Wash Block For Mt & Boys And Ft & Girls Including All Associated Construction, Sanitary, Plumbing & Electrical Works At Different Upazila In Gaibandha District Under Pedp-4 Project 2025-05-30
India Supply Of Heat Shrinkble Sleeve 12.7 Mm (25-35 Sqmm) #*. Heat Shrinkable Sleeve 12.7 Mm To Icf/edml-101 Rev.0 Item 5. Eligibility Criteria For Regular Order Bulk Procurement Will Be Made From The Firms Who Have Supplied 50 Coach Sets Of Tendered Item Or S 2025-05-30
India Supply Of Polymer Packing Washer #*. Polymer Packing Washer To Drg. No. Arl/ppw/0506 For Pu Side Bearer (drg. No. Aal-021101/n, Alt-1 Or Latest). [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Safety Chain Complete For Palm Pull Rod To Drg.no.emu/m-3-2-070, Col-i, Alt-c. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Door Chainless Cotter Bkt. #*. Door Chainless Cotter Bkt. Drawing No :- Wd - 90030 - S - 66, Alt. 10, Item No. 13 . [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-30
India Supply Of Pipe Set 20 N.b. With Sockets & Flanges Complete #*. Pipe Set 20 N.b. With Sockets & Flanges Complete . Drawing No :- Wd - 90030 - S - 72 , Alt. 4, Item No. 9 To 11 . Spec. No:- 04-abr-02 (rev. 01 Of Nov. 2017) Material Of Pipe:- Stainless Steel 2025-05-30
Bangladesh Improvement Of Sahagola Station -pirpara Road By Bc From Ch. 265m-800m Under Atrai Upazila, District: Naogaon. (road Id-164035021) Salvage Cost-254868.00 Tk. 2025-05-30
Bangladesh Part-a: Improvement Of Sudarshana Gps-chakdebnagar Road By Bc From Ch. 00m-1000m Under Atrai Upazila, District: Naogaon. (road Id-164035116) Salvage Cost-1810183.00 Tk. Part-b: Improvement Of Sudarshana Gps-rhd Road By Bc From Ch. 00m-500m Under Atrai Upa 2025-05-30
Whats app