Filter Search


Asia


Location Summary Deadline
India Supply Of 23 Teeth Pinion For Tm Hs-15250a, Wap4 Loco #*. 23 Teeth Pinion For Tm Hs-15250a, Wap4 Loco, As Per Rdso Drawing No. Skdl-4356 Alteration- B And Confirming To Rdso Specfication No. Mp.0.2800.09 Rev 0.2 Of June 2005. [ Warranty Period: 30 Months 2025-05-30
India Supply Of 73034204: Bolt M.s.black Hex Head Round Body Without Nuts Size: M 16 X 50 Mm Long To Is:1363/part-i/2002.(fourth Revision.)property Class 4.6 Material Should Be Packed In Double Gunny Bags. 2025-05-30
India Supply Of Paint Enamel Interior Undercoating White To Is:133/2013 & Icf Specn.icf/md/specn-052 Issue Ststus-02 Revision-01. (with Latest Version) Packing In 20 Ltrs. New Non Returnable M.s. Drums To Is:2552/89 Gr. B- Ii. #*. Paint Enamel Interior Undercoa 2025-05-30
India Supply Of Carbon Brush Type Cgl Make Tm 2141a For 700hp Cgl Type Traction Motor Grade-egi 4d, Size Width 20 Mm (split) Breadth 40 Mm Lenght 57 Mm Condemn Size 32 Mm Lenght Type Tm 2141a Grade-eg14d , Size- 20wx40bx57mm L, Condemn Size-32 Mm(length) Specn: 2025-05-30
Bangladesh 1. Construction Of Rcc Road From Sabek Billchori Carpeting Road To Necer Marma Para (ch.00m-85m) At Ward No.06, Under Lama Pourashava, District: Bandarban 2. Construction Of Rcc Road From Razbari More 2025-05-30
Bangladesh Yearly Operation Servicing & Maintenance Of 2 Nos 7.5 Hp Pump Motor Set Of Azimpur Population Building At Dhaka. (fy:2024-2025) 2025-05-30
Bangladesh (a) Re-construction Of 12.00m Long Rcc Girder Bridge On Laksam H/q - Natherpetua Rhd Via Munshirhat Gc Road(monohargonj Portion) Road At Ch. 8965m Under Monohorgonj Upazila, District: Cumilla(road Id: 2025-05-30
Bangladesh 1. Construction Of Rcc Road From Kuraliartek Carpeting Road To Abul Bashar House (ch.00m-710m) At Ward No.05, Under Lama Pourashava, District: Bandarban 2. Construction Of 3 Nos (size=3.65mx1.82mx0.91 2025-05-30
Bangladesh 1. Construction Of Rcc Road From Beauty Master House To Jalal House (ch.90m-300m) At Ward No.09, Under Lama Pourashava, District: Bandarban 2. Construction Of Rcc Road & Palisading Wall From Lama-alik 2025-05-30
India Re Etenderannual Plan-mathilakam Bp Maintenance And Providing Other Infrastructure Facilities In Chc Perinjanam 2025-05-30
Whats app