Filter Search


Asia


Location Summary Deadline
India Additional Electrical Works In Pmg (o) At Varanasi Region, Varanasi. 2029-04-26
India Design, Fabrication, Supply, Installation, Testing, Commissioning And Trial Run Of Passenger Lift Including Construction Of Rcc Well At Bilaspur Bhawan, Indira Vihar Colony Bilaspur Cg Along With Maintenance For A Period Of 5 Years On Turnkey Basis 2029-04-27
India Prvidng Installatn And Commissining Of 1no Electrical Traction Type Of 20passngr 1360kg Capacity Up To G2 Level Lift At Sabrom Sub_divisionl Hospital Sabrom South Tripura Including 3year Of Camc Aftr 1year Warrnty Period Of Lift Installation 2nd Call 2029-04-27
China Design, Supply, Installation, Operations And Maintenance Electronic Toll Collection (etc) Systems For Addis Ababa-adama Expressway 2029-04-30
Qatar Scaffolding Services On Call-off Basis In Dukhan Field 2029-04-30
India Supply And Insttalation Of 150 Nos Of Solar Street Light In Project #*. Supply And Insttalation Of 150 Nos Of Solar Street Light In Projectaffected And Vicinity Villages Khargone Stpp 2029-04-30
India Concession To Design, Fit-out, Finance, Develop, Market, Operate, Maintain And Manage The Food And Beverage Outlets At The Srinagar Airport 2029-04-30
Hong Kong Supply And Installation Of Stereotactic Systems, Image-guided, Biopsy For Tseung Kwan 2029-04-30
Singapore Design And Construction Of Two Stations, As Well As A 1.4km Viaduct Between The Two Stations Near Nanyang Technological University (ntu). 2029-04-30
China Erp Management System 2029-04-30
Whats app