Filter Search


Asia


Location Summary Deadline
India Supply Installation Testing Contract Onm Grid Connected Rooftop Solar Photovoltaic System At St-2 Ntpc 2029-04-21
India Comprehensive Annual Maintenance Contract Of 06 Nos. Of Hyundai Make Elevators Installed At Dwarka Airport Depot For A Period Of 05 Years. 2029-04-22
Qatar Valve Maintenance Support Services At Offshore & Onshore 2029-04-22
India Comprehensive Annual Maintenance For Schneider Make Ups Installed At 08 Ug Stations Of Line-7 Metro Stations Of Dmrc For Five Years 2029-04-22
Qatar Valve Maintenance Support Services At Offshore & Onshore 2029-04-22
Qatar Valve Maintenance Support Services At Offshore & Onshore 2029-04-22
India Surveying, Planning, Design, Construction, Installation, Testing And Commissioning Of 350 Kld Sewage Treatment Plant Based On Moving Bed Bio Reactor (mbbr) Technology Including Trial Run, Operation And Maintenance For 5 Years At Bhokai Colony 2029-04-24
India Supply Of Oil Cylinder, Pure Mineral #*. Oil Cylinder, Pure Mineral To Is: 1589-94 (reaffirmed 2006), (revision-1) Gr.vg-680 Type-i With Rdso Additionalrequirement As Slip No. 1 Issued By Rdso On August 2016". As Per Specn. Is-1589-94 Ty-i [ Warranty Peri 2029-04-24
India Supply Of Brass Round Bar (02) Items & Phosphorus Bronze Round Bar #*. Brass Round Bar (generally 66% Cu & 34% Zn), Size: 25mm Dia X 300mm Long, Hsn Code: 7407 [ Warranty Period: 30 Months After The Date Of Delivery ]brass Round Bar (generally 66% Cu & 34 2029-04-25
Qatar Provision Of Data Mapping Services For Offshore & Onshore Wells 2029-04-25
Whats app