Filter Search


Asia


Location Summary Deadline
India Koduvally Municipality 136/24 Palakutty Cheedikunnu Road Div 31 2025-05-14
India Construction Of Nalukettu Irattachira Link Road In Ward 7 Of Koratty Gp-roadgeneral Civil Work 2 #*. Civil Work. 2025-05-14
India Construction Of Spt Structure For 15 Sos Accommodation And Jawan Barrack At B Op Laxmijhora Of 54th Bn Hqrs Of 54th Bn Ssb Bijni Under Guwahati Frontier. 2025-05-14
India General-perekonam Kulam-renovation And Allied Works Of Perekonam Kulam In Estate Ward Of Nemom Constituency -general Civil Wor 2025-05-14
India Construction Of Cc Road And Rcc Drain In Ward No 05, 10, 11, 12, 13 At Different Locations And Samaj Bhawan , Samudayik Bhawan In Ward No. 05, 07, 09, 10, 12, 13, 14 At Different Locations Under Cm Infra-4 Phase 2025-05-14
India Improvement To Naygaon Chunchale Sakali Manvel Thorgavhan Road Mdr 12 Km 0/700 To 4/000 Tal. Yawal Dist. Jalgaon (section-naygaon To Chunchale) 2025-05-14
India Supply Of Damper Assembly For High Reach Pantograph. #*. Damper Assembly For High Reach Pantograph Type-lx3600, Make-ftrtipl To M/s Ftrtipl Part No- Ft0072490-111. Each Set Consisting Of 6 Items In 13 Nos. [ Warranty Period: 30 Months After The Date Of De 2025-05-14
qty:73
>India
qty:73
>Supply Of Prefab Shelter Using Puf Panels Of Different Sizes (q3), Prefab Toilet Block Of Size 4 88 M X 7 32 M (as Per Gem Drawing) (q3)
qty:73
qty:73
>2025-05-14
India Supplying Of Building And Other Work Material At Bholawade Tal Bhor 2025-05-14
India Supply Of Control Valve Assembly #*. Control Valve Assembly To Elgi Part No.eu8525000 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-14
Whats app