Filter Search


Asia


Location Summary Deadline
United Arab Emirates Install A Rooftop Solar Power System For Al Abbar Aluminium 2038-03-31
India 4790n001-supply, Installation, Testing And Commissioning Of Machine Roomless And Gearless Type Passenger Lift/elevator Of 10 Passenger/680 Kg Capacity With Arise Of 5710 Mm As Per Specification No. "m 2038-04-24
India 29740230-igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (m V B) As Per Iec-61375, Terminal Bracket, Bus Bar Link And Cu Braid Requ 2038-04-26
India 29740230-igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (m V B) As Per Iec-61375, Terminal Bracket, Bus Bar Link And Cu Braid Requ 2038-04-26
India Supply Of Procurement Of Pressure Control Valve For E-70 Brake System Etc. #*. Pressure Control Valve For E-70 Brake System For Wag-9 & Wap-7(3-phase) Locos Confirming Toclw Spec No.-clw/ms/3/001 Alt-16( Item Sl.no.-102) & Pt. No.033001000 Of M/s Ftrtil. 2038-04-26
India Supply, Installation, Testing And Commissioning Of 3x100tr Screw Chillers With Vfd Energy Efficient In Place Of Old Age 3x80tr Reciprocating Chillers Including Associated Accessories Installed At Shas 2038-05-11
India Rehabilitation Upgradation Of Existing Sewage Treatment Plant On Design, Build And Operate Basis, 1 Year Dlp Plus 15 Years O And M, At Raipur Kalan And Raipur Khurd, Chandigarh Under Smart City Projec 2038-06-05
India Rehabilitation Upgradation Of Existing Sewage Treatment Plant On Design, Build And Operate Basis, 1 Year Dlp Plus 15 Years O And M, At Diggian, Sector 66, Chandigarh Under Smart City Project 2038-06-05
India Development, Operation And Management Of Water Sports / Activities, Cafeteria, Children Park Etc. At Prashaanti Udyan At Dighalipukhuri, Guwahati 2038-06-10
India To Lease Of Fish Seed Production Center Aarey, Dist. Mumbai Sub 2038-07-02
Whats app