Filter Search


Asia


Location Summary Deadline
India Annual Maintenance Of Mmrda Office Building At Bandra (e), Cr-2 (nariman Point) And Sro Office 2026-01-14
India Lowering And Lifting Of Submersible Pump And Motor With Other Allied Works Including Fabrication And Supplying Of Column Pipe At Chandipur Rd Block Under The Jurisdiction Of Dws Sub-division Kailashahar_gr-i 2026-01-14
India General-construction Of Educational Complex Chembukkavu, Thrissur-work-composite Work #*. This Building Is Proposed To Be Constructed In 2floors Building Is Proposed To Be Constructed As Framed Structure And Structural Members Are Taken As Per The Tentati 2026-01-14
India Work Of Improving Operating Efficiency And Sustaining Performance, Leveraging Technologies And Best Practice To Improve Service Delivery Of Existing Sewage Pumping Stations Under S.o. Department 2026-01-14
India Supply Of Clip #*. Clip As Per Drg.no. 8282049 Alt Ab Specn: Purchase Specification No.misc.506 Rev.r1 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted 2026-01-14
India Pazhayannur Gp - Neernamukku Canal Palam (proj. No. 241/2024-25) 2026-01-14
India Year 2024-25 Material Supply And Equipement Supply For Construction Work In Gram Panchayat Jhankali Panchayat Samiti Gadraroad Zp Barmer 2026-01-14
India Supply Of Tab Mycophenolate Mofetil 500 Mg #*. Tab Mycophenolate Mofetil 500 Mg[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ] 2026-01-14
India Supply Of Compressed Natural Gas Through Suppliers Owened Mobile Cng Cascade (having Pressure @ 250 Kg/ Cm2) At Wrs Kota (warranty Period : Having No Guarantee/warranty Asitem Is Gas)[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Va 2026-01-14
India Annual Plan-annual Plan 2024-25 Chazhur Gp-maintenance Of Alappad School In Ward No.v Of Chazhur Gp.project No.302/25-chazhur 302 2026-01-14
Whats app