Filter Search


Asia


Location Summary Deadline
India Introduction Of 3 (three) Nos. Of Continuous Miner Package (two Sets Of Lhcm Package And One Standard Height Cm Package) For Winning Coal Without Blasting From The District(s) In Khairaha Ug Mine Of Sohagpur Area Of Secl On Hiring Basis 2031-10-08
India Sitc Of Ip Based Telephone Exchangeat Ntpc Barauni 2031-10-15
Hong Kong Supply And Installation Of Digital Radiography, Retrofit System (retrofit Dr) And (item 2) Provision Of Maintenance Service 2031-10-18
India Renovation Of Existing Sewage Treatment Plant (stp) Based On Sbr Technology, Sewage Network System (minimum 6000 Meter) And Boundary Wall (minimum 300 Meter) At Vasant Vihar Colony, Secl Bilaspur On Turnkey Basis Including O And M....(refer Nit). 2031-10-19
India Construction Of 13 Nos. D Type Quarters At Chhal Sub Area At Raigarh Area On Turnkey Basis Including 05 Years Of Maintenance During Defect Liability Period (dlp). 2031-10-22
Malaysia Construction Works For Pnb Merdeka Ventures Sdn Bhd 2031-10-31
India Supply Of Plain Grinding Wheel Size 150 X 25 Thick X 15.88 Bore Grit & Grade A163 R5bm4ofcarborundum A14 Q6 Bl5 Of Grindwell Norton Is:2324/71 And Is: 1249/72 [ Warrantyperiod: 30 Months After The Date Of Delivery ] 2031-11-04
India Supply Of Computerized Universal Testing Machine. 2031-11-09
China First And Second Phases Of Ai Khairat Heavy Oil Power Plant In Iraq. 2031-11-30
Malaysia Undertake foundation works for an exhibition centre and hotel 2031-11-30
Whats app