Filter Search


Asia


Location Summary Deadline
India 29741075-igbt Based 3-phase Drive Propulsion Equipment As Per Drg./ Spec. Rdso/2008/el/spec/0071, Rev.5. Issued In June-2016 2029-12-31
India 29741075-igbt Based 3-phase Drive Propulsion Equipment As Per Drg./ Spec. Rdso/2008/el/spec/0071, Rev.5. Issued In June-2016 2029-12-31
India Comprehensive Operation And Maintenance And Special Repair Of Ward Level Piped Water Supply Schemes Constructed By The Panchayati Raj Department And Handed Over To Phed For 4 Years; Excluding The Cost Of Energy Charges And Operator Wages Under P.h. Divisi 2029-12-31
Bangladesh Supply, Installation, Commissioning And Testing Of A Simulator With Accessories & Movable Laser For Ct System At Inmp, Savar. 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India Design, Supply, Installation, Testing And Commissioning Of Solar Highmast Under Sd Budget Be 2024-25 At Vstps 2030-01-06
India Replacement Of Gail Telecom System In Bnpl, Cgpl, Cjpl, Snpl, Dvpl, Vijaipur, Dibiyapur, Pata And Ncr Ofc Routes 2030-01-07
India License For Advertisement Rights At Various Locations (inside And Outside) In Metro Station Premises 2030-01-07
Whats app