Filter Search


Asia


Location Summary Deadline
India Supply Of Steel Wire 1.2mm In Spool Of Weight #*. Steel Wire 1.2mm In Spool Of Weight Approx.15 Kg. As Per Drg.no. En 440-g3si1 And Pren-759, Residual Life 12 Months From The Date Of Receipt In Store. [ Warranty Period:30 Months After The Date Of Delivery 2026-03-31
India Supply Of 30020487: Axle Box Housing (finish Machined) To Icf Drg. No. T-0-2-602, Alt.- V/14, Sheet No. 1 & 2, Item No. 2, Conforming To Rdso Spec. No. Rdso/2007/cg-08 With Amendment Slip No. 1 Of July 2009 Make/brand: S 2026-03-31
India Engaging Essential Labour For The Maintenance Of Guest House, Krishnagiri 2026-03-31
India Supply Of 10128421: Srphc065056-trastuzumab Deruxtecan Inj 100mg Vial Unit:vial 2026-03-31
India Supply Of 10124577: Srphc074031-ferrous Fumarate 200 Mg + Folic Acid 1.5 Mg + B12 15 Mcg Timed Release Cap Unit:cap Firm's Offer: As Per Tender, Make/brand : Calhem 2026-03-31
India Tender Invited For High Capacity Draft Gear (fitment Suitable As Per General Arrangement For Wag-9. #*. High Capacity Draft Gear (fitment Suitable As Per General Arrangement For Wag-9 As Per Drg No. Skdl-3430 Alt-8 Or Latest & Rdso Spec No.49-bd-08 Amendm 2026-03-31
India Supply Of Adhesive For Lhb Coaches (suitable Between 5 To 48 Deg.celcius Temp) In 300/310 Ml Tube-packing Or Sausage Packing, As Per Make/brand: Sikaflex 265 Of M/s.sika Or Terostat 8590 Of M/s Henkel Or 08609 Windo-weld Super Fast Urethane Of M/s 3m For 2026-03-31
India Supply Of Under Frame Complete #*. Under Frame Complete For Emu D Coach To Drg No 57511001, Col-2, Alt 'k'. The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev-02 With Amendment No. 01. Special Condition : 1. The Underframe Should Be S 2026-03-31
India Supply Of 81040015: Gas Acetylene Dissolved To Is: 308/2024, Fourth Revision. Oem : Super Gases And Chemiclas, Sonepat (haryana). 2026-03-31
United Arab Emirates Provision Of Camp Support Services To Unmiss 2026-03-31
Whats app