Filter Search


Asia


Location Summary Deadline
Qatar Epic For Various Pipeline Mocs In Dukhan – Year 2023 2026-03-31
India Supply Of Stainless Steel Wire 0.8mm #*. Stainless Steel Wire 0.8mm Diameter In Spool Of Weight 12.5 Kg. As Per Drg.no. Din 8556 Part 1,1. 4316 Residual Life 12 Months From The Date Of Receipt In Store. [ Warranty Period: 30 Months After The Date Of Deliv 2026-03-31
India Renovation Of Murluk Barakol Sarkariya Raktrohna Bandh Scheme 2026-03-31
India Supply Of Under Frame Complete #*. Under Frame Complete For Lscn Shells To Drg. No. 73911001, Alt 'g',col.i-1 N0. The Firm Shall Fulfill The Manufacturing Facility Requirement As Per Icf/md/spec-147, Issue Status 01, Rev-02 With Amendment.01 Special Condi 2026-03-31
India Supply Of 81981119: Shielding (argoshield-51) Gas For Mig Welding (argon-81.5%,co2-16%,oxygen-2.5%). Make & Brand: Ellenbarrie 2026-03-31
India Annual Plan-improvement Work For Mundasseri Edatholamade Road In Ward No. 3-vengara Grama Panchayath, Project No. 366/2024- 25-general Civil Work 2026-03-31
Bangladesh Construction Of 250mm Dia 500 Meter (each) Length (extension) Upvc Burried Pipe Line. Pipe, Fittings And Riser Valve To Be Supplied By The Authority. Total Length 5000 Meter 2026-03-31
India Supply Of Unf Asr Pneumatic Cont Eqpt For Lhb #*. Supply Of Control Equipment For Air Suspension System For Lhb/eog Coaches To Material Schedule No. Icf/sk-10-2-674,issue Status-01, Rev-00 [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-03-31
India Supply Of U/f Front Part For Lhb Eog Coaches #*. Under Frame Front Part For Lhb Eog Coaches To Drg.no.58111003, Alt "s". The Manufacturing Facility Requirement As Per Ice/md/spec-147, Issue Status-01, Rev-02, Amendment No-01. Special Condition : I) The Un 2026-03-31
Qatar Epic For Various Pipeline Mocs In Dukhan – Year 2023 2026-03-31
Whats app