Filter Search


Asia


Location Summary Deadline
India Set Of Kit For Pressure Control Valve As Per Ftrtipl Part No.790033105 Qty 03 Nos Kit ( Kit No 1 And2 Consisting 7 Items In Each And Kit No 3 Consisting 13 Items) As Per Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-30
India Operation And Guarding Of Pumping Machinery At Pump House No. I ,ii , Zone-i P/h -i, Under Barakaimari W/s Scheme, In The Dist. Of Coochbehar 2026-01-30
India Rmc/civil/misworks/255/2022 2026-01-30
India Supply Of 81040015: Dissolved Acetylene Gas For Industrial Use To Is:308/1988 With Amdt.no.1, Third Revision, Reafirmed-2011. 2026-01-30
India Annual Plan-malappuram Dp (2024-25), Project No 278-25 -renovation For Manakkad Pathirippadam Canal - Edakkara-general Civil Work (retender) 2026-01-30
India Construction Of The Ums Dogachi Urdu Block - Meharma, District - Godda 2026-01-30
India Design, Manufacturing, Supply And Erection Of G Plus 1 Building At Patharnaki, Kiru Hep, Dist. Kishtwar #*. Design, Manufacturing, Supply And Erection Of G Plus 1 Building At Patharnaki, Kiru Hep, Dist. Kishtwar 2026-01-30
India Supply Of One Coach Set Layout Of Notices For Vb Metro Tc, Mc, Mc2, Mc3 & Ndtc Coaches To Drg.no. Ts/vm/dtc-6-4-002, Alt-a, Col-2 (except Items- 27 & 28). [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-30
India Building Retrofitting And Interior Works- Mr 2026-01-30
India Providind Bolero In Shahdol Disst 2026-01-30
Whats app