Filter Search


Asia


Location Summary Deadline
India Supply Of Design Supply Erection Testing And Commissioning Of Vcb Testing Bench. #*. Design Supply Erection Testing And Commissioning Of Vcb Testing Bench Suitable For Emu/memu/wag7 As Per Specification Attached Annexure A. [ Warranty Period: 24 Months Af 2025-05-21
India Supply Of Shield Gas-mixture Consisting Of Argon And 1-5 % Oxygen Gas As Per Specification Aws A 5.32/a5.32m-97(r 2007) Or Latest Filled In Cylinders With Capacity Of 7 Cum And Maximum Working Pressure Of 150 Bar For Mig Welding Purpose.packing And Transp 2025-05-21
India Supply Of Non-asbestos L-type Composite Brake Block For Freight Stock. #*. Non-asbestos L-type Composite Brake Block For Freight Stock, To Drawing/specification Rdsostr No.wd-13-abr-2019 And Rdso Drg. No.wd-99062-s-01, Alt No.4. [ Warranty Period: 30 Mont 2025-05-21
India Work Of Enclosing The Kavi Anant Fandi Auditorium Ceiling, For Sangamner Municipal Council 2025-05-21
India Construction Of Asha Gruha (g.f.) And Attendant Rest Shed (f.f.) At Hemgir Chc, Sundargarh Under Ombadc For The Year 2024.25. 2025-05-21
India Upkeeping And Maintenance-pathologically Habour Engineering Subdivision Office And Premises For The Year 2023-24. 2025-05-21
India Annual Plan-chellanam Gp 2023-24-282/24kalathra - Kochuchira Road Second Phase-general Civil Work. 2025-05-21
India Panjimukk Sc Colony Drinking Water Project At Vazhikkadavu Gp In Nilambur Bp 2025-05-21
India Lac Ads Mla Ads Nip Construction Of New Bridge Across At Ch 0m And 910m Of Vellayani East Branch Canal At Ch 13570m Ch16300m 15900m Of Vizhinjam Branch Canal At Ch 9300 M Deleted 10800m 15700m Of Chowara Branch Canal The Widening Of Exis #*. Construction 2025-05-21
India Project No.742/2022-23 Kollam Muncipal Corporation Dn 46 Kda Building Completion Work. 2025-05-21
Whats app