Filter Search


Asia


Location Summary Deadline
India Repairing With Dismantling Of Of A Frame By Removal Of Pin Bushes , Fabrication Of Pin And Fitment Along With Bushes Plates And Nuts Of Cat777d Dumper Th12 At Ashok Ocp At Piparwar Area. 2032-03-25
India Repairing With Dismantling Of Of A Frame By Removal Of Pin Bushes , Fabrication Of Pin And Fitment Along With Bushes Plates And Nuts Of Cat777d Dumper Th12 At Ashok Ocp At Piparwar Area. 2032-03-25
India 29741087-2x500 Kva Igbt Based Hotel Load Converter For 3 Phase Electric Locomotives Wap-7 Locos. Specn: Clw/es/3/igbt/0490. Alt - D, (rev.1) 2032-03-31
India 29741087-2x500 Kva Igbt Based Hotel Load Converter For 3 Phase Electric Locomotives Wap-7 Locos. Specn: Clw/es/3/igbt/0490. Alt - D, (rev.1) 2032-03-31
India 29741087-2x500 Kva Igbt Based Hotel Load Converter For 3 Phase Electric Locomotives Wap-7 Locos. Specn: Clw/es/3/igbt/0490. Alt - D, (rev.1) 2032-03-31
India 29741087-2x500 Kva Igbt Based Hotel Load Converter For 3 Phase Electric Locomotives Wap-7 Locos. Specn: Clw/es/3/igbt/0490. Alt - D, (rev.1) 2032-03-31
Spain Repair And Maintenance Of V2500 Engines From Qatar Airways. 2032-03-31
India Wbpwd/pw(r)/sepd/piu-i/nib No-02/ae Of 2019-20 Sl No-1 2032-04-17
India Design, Manufacturing, Supply, Foundation , Installation, Testing, Commissioning And Proving Of Coil Scragging And Load Deflection Testing Machine As Per Attached Specifications 2032-04-30
Qatar Supply Of Compression Fittings And Spares On Long Term Agr. 2032-04-30
Whats app