Filter Search


Asia


Location Summary Deadline
India Supply Of Nut For Air Ducts & Cleats 1/2" #*. Nut For Air Ducts & Cleats 1/2", Drg. No. Kgp/dl/nt-111, Alt.-"4". [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-10
India Etender Notice No 3 2025-12-10
India Contract Awarded For: Construction Of North City Bus Terminal At Dechencholing Construction Of North City Bus Terminal At Dechencholing Contract Value (nu.): 32290656.890 Date Of Letter Of Acceptance: 27-may-2025 Date Of Contract Signing: 04-jun-2025.cons 2025-12-10
India For Operation And Maintenance Work Of 33/11 Kv Substation 18-ec Road And Its Associated Lines 33 Kv 11 Kv 0.4 Kv Dtr And Redressal Of Consumer Complaint Under Under Edd Central Dehradun Through Outer Agency For The Period Of 02 Years 2025-12-10
India I) Construction Of Da Gaon Lahowal Connecting Road From Ch:0.00 Km To .450 Km, (ii) Construction Of Tamuli Gaon- Sangmai Gaon Road, (iii) Construction Of Kamarkhatowal Samchan Road And Public Health Sub-centre Road (length : 0.70km), (iv) Construction Of 2025-12-10
India M.o.w. To S.r.p.f. Group -viii (e) (repairs And Renovate New Road) 2025-12-10
India Steel Cable Tray Of The Ss Sheet Of Width 150mm X 50 Mm X 2 Mm,ms Cable Tray Cover Of Width 450mm X 2025-12-10
India Const Of Passage And Drain At Karve Nagar. 2025-12-10
India Construction Metrial Supply Ngar Parishad Garoth. 2025-12-10
India Performance Based Contract For Operation And Maintenance Of Lwss Churat For One Ear Including Feeder Line Of 250 Mm Dia 300 Mm Dia Upto Wtp Churat Under Sanjauli Sub Division Nat Includes Rising Main Pipe Line Of 300 Mm 175 Mm 125 Mm Dia Of Chu 2025-12-10
Whats app