Filter Search


Asia


Location Summary Deadline
India Clobetasol 0.05 % + Salicylic Acid 3% Cream 15 G Tube .#* Srphc087056-clobetasol 0.05 % + Salicylic Acid 3% Cream 15 G Unit:tube [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma x 8 Lacs ] ] 2025-12-31
India Contract Awarded For 7th Avenue Depot - Design 7th Avenue Depot - Design.7th Avenue Depot - Design 2025-12-31
Turkey Consultancy Services For Construction Supervision Of Strengthening Of Public Buildings 2025-12-31
India Supply Of Isapghula Husk 3.5gm+ Lactulose /lactilol 10gm Per 15gm, In 180 Gm Bot #*. Srphc006021-isapghula Husk 3.5gm+ Lactulose /lactilol 10gm Per 15gm, In 180 Gm Bot Unit:bot[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Var 2025-12-31
India Civil Maintenance Bilaspur Ro. 2025-12-31
India Jalgaon Asf Developement 2025-12-31
India Tender Invited For Monthly Basis Cab And Taxi Hiring Service - Without Fuel - Suv; Mahindra Scorpio, Mahindra Bolero; 2025; 0-25,000 Kms; A/c; As Per Scope Of Works##quantity: 3## 2025-12-31
India Connection Complete With Clamping Plate [without Insulation] .#* Connection Complete With Clamping Plate [without Insulation], Drg. No: 1t wd.096.014 Alt-5, Spec. No: 4tms.096.062 Alt-5, Str No: Clw/tm/10060 Rev-1. [ Warranty Perio d: 30 Months After The 2025-12-31
India Supply Of 77034960: Pu Paint Kit For Complete Assembled Detc Consisting Of 04 Items To Set List No. Detc77034960 Rev.-1, Rdso Specifications Rdso/m&c/pcn/100/2018 Chapter-iii, Iv, & V With Amendment No. 1a(rev.-1.0), 1b 2025-12-31
Singapore Build The Biosolids Treatment Facility For The Tuas Water Reclamation Plant (wrp) – A Major Component Of The Deep Tunnel Sewerage System (dtss) Phase 2 Project 2025-12-31
Whats app