Filter Search


Asia


Location Summary Deadline
India Injector,self Starter,push Rod,brake Booster,wiper Blade Safari,big End Brg Cell,stopper Cable,unio 2025-10-31
India Supply Of 820503570019: Ademethionine 1, 4 Butane Disulfonate 400 Mg Tab 2025-10-31
India Three Phase Induction Motor For Compressor .#* Three Phase Induction Motor For Compressor, 10.5kw, 975 Rpm, 290-500 Volt s, 6310c3 Bearing, S4 Duty Insulation H Class To Clw/es/c-34/m. It Is Aux. Motor Of Compressor (mcp). [ Warranty Period: 30 Months Aft 2025-10-31
India Supply Of Dialysis Machine & R.o. System On Turnkey Basis #* Medical And Surgical Equipments 2025-10-31
Bangladesh Contract Award For: 1. Rehabilitation Of Road By Dbc Starting From Darail Bazar To Khidropari H/o Liaqat (ch.00m-1420m) At Ward No 08, Under Gabtali Pourashava, District: Bogura.2. Contraction Of Rcc Road & 1 Nos X-drain Start From Unchurkhi Main Road To 2025-10-31
India Track Maintenance Works For The Section Aluva To Sn Junction And Muttom Depot 2025-10-31
India Contract Award For: Repair And Renovation Works Of Lalon Shah Hostel At Kushtia Polytechnic Institute Under Sadar Upazila At Kushtia District. contract Value (taka): 2721600.000 no. Of Tenders/proposals Sold: 3 no. Of Tenders/proposals Received: 3 ten 2025-10-31
India Operation, Repair And Maintenance Of Water Supply System Of Industrial Area In Khadia Project 2025-10-31
India Supply Of Key Multiplier-1 #*. Key Multiplier-1 For M/c Compartment Specn: Clw/es/3/0049/f [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-10-31
India Supply Of 29612937: Led Based Flasher Light I) Elrs/spec/lfl/0017 (rev.1, Sept 2004). Ii) Clw/es/sk-3/l-21/c Spec:i) Elrs/spec/lfl/0017(rev.1 Sept.2004) Ii) Clw/es/sk-3/l21/c. 2025-10-31
Whats app