Filter Search


Asia


Location Summary Deadline
India Supply Of 30140651: One Coach Set Of Roof And Side Wall For 3ph Memu/dmc Coaches To Drg. Nos. I) (memu/dmc/3ph) 74514060, Alt 'nil', Col.i - 1 No. Items Nos.1,2,7 & 5 To Be Supplied As Single Assembly Items Nos.3,4,6 2026-03-31
India Supply Of 31150172: One Coach Set Of End Wall For Train Set Mc,tc And Ndtc/ec Coaches To Drg. 89115001,alt.'e', Col.i - 1 No 89115002,alt.'e', Col.i - 1 No The Firm Shall Fulfil The Requirement As Per Icf/md/spec-315, I 2026-03-31
India Supply Of 10124454: Srphc013119-sacubitril 24mg + Valsartan 26mg (50mg) Tab Unit:tab Firm's Offer: As Per Tender, Make/brand : Nepril-50 2026-03-31
India Supply Of 31027088: Emu/demu/memu Wheels To Drg No - K-4004(forged Wheel) Or Drg No. Rwf-w-111 (for Cast Wheel). 2026-03-31
India Supply Of One Coach Set Of 3mm Lavatory Side Wall For Lhb Lgs/eog & Lscn/eog Coaches To Drg. No. 67014010, Col-i, Alt "b" - 1 No, 67014011, Col-i, Alt "c" - 1 No, 58214042, Col-i, Alt"b" - 1 No, 58214044, Col-i, Alt "b" - 1 No. The Firm Shall Fulfill The 2026-03-31
India Supply Of Epoxy Based Elastified Top Coat #*. Supply And Apply Of Epoxy Based Elastified Top Coat (2 Components) Shade Ral-7012 For Painting Of Underframe Of Coaches As Per Drg.no. Mdts-094 Revision 01 With Amendment Slip No.1 Of Nov'2008. Test Panel For 2026-03-31
India Vhb Tape 2.3 X 25 Mm .#* Vhb Tape 2.3 X 25 Mm In Roll Length Of 7 Metres, As Per Drawing/specification: Ma ke 3m 4991 Alongwith 3m Primer 94 (40 Ml Per Roll In Packing Of 500ml) Or Equivalent Or Confi rming To Spec Icf/md/spec.-165, Issue Status 01, Rev.n 2026-03-31
India Tadalafil .#* Srphc045182-tadalafil 5 Mg Tab Unit:tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma x 8 Lacs ] ] 2026-03-31
India Supply Of 29171180: Complete Auxiliary Cubicle Hb1 Along With All Equipments And Cabling For Wag9 Loco. Note: (bare Panel Shall Be As Per Drawing No.1209-15.143-001 Alt.11 & Spec. No. Clw/ms/3/047 Alt.12). Spec. (1) Clw 2026-03-31
India Supply Of S&i Of Cable Duct & Pipe Mounting Ls/lws #*. Supply And Installation Of Underframe Cable Duct And Pipe Mounting To Drg No.lgs/eog-7-1-002, Col I&ii, Alt. F. For Lgs & Lsdd Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-03-31
Whats app