Filter Search


Asia


Location Summary Deadline
India Ph Works (si,sd And Ws) To Construction Of Sub Centre Building At Kandei Of Turekela Block In Balangir District Under State Plan Mmssm In The Fy 2023-24. 2025-05-25
India Ph Works (si,sd And Ws) To Daycare Sub Centre Cum Hwc Building (g 1) At Paikbahal Of Tarva Block In Sonepur District In The Fy 2024-25. 2025-05-25
India Ph Works To Construction Of Sub Centre Building At Bareigoda Of Harichandanpur Block In The District Of Keonjhar Under Xvfc. 2025-05-25
India Supply Of Set Of Damper For Wag-9h Etc #*. Set Of Damper For Wag-9 Loco To Clw Specification No. Clw/ms/3/009 Alt. 03,consisting Of Following Four Items: (1) Axle Damper As Per Drg.no.1209-01.215.014, Ref-1,alt-2.qty/ Set: 08 Nos. (2) Vertical Damper As P 2025-05-25
India Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Others 2025-05-25
India Supply Of Railway Carriage Fan Fixed Type 300 Mm #*. Railway Carriage Fan Fixed Type 300 Mm Sweep Operated At 110 V Ac Supply Conformingto Type. I Of Icf Annexure 1 To Is: 6680-1992 With Rdso Annexure-'h' Of Dec.2005 [ Warranty Period: 30 Months After The 2025-05-25
India Supply Of Gear Case Assembly Kit Consisting Of 08 Items To Dlw Part No.17453793.and Dlw Drg No.k-1745012 Alt.j (dlw Part No.17453793) #*. Gear Case Assembly Kit Consisting Of 08 Items To Dlw Part No.17453793.and Dlw Drg No.k-1745012 Alt.j (dlw Part No.174 2025-05-25
India Construction Of P.h. Work ( Ws, Si And Sd ) For Awc At Mindol In The District Of Angul 2025-05-25
India Supply Of Split Ring Complete #*. Split Ring Complete For Drg. No. Emu/m-0-6-012 Alt Nil. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-25
India Construction Of P.h. Work ( Ws, Si And Sd ) For Awc At Khalari (b) In The District Of Angul. 2025-05-25
Whats app