Filter Search


Asia


Location Summary Deadline
India Supply Of 81040660: Extra High Purity Helium Gas (for Procurement Of Extra High Puirty Gases Terms & Conditions For Tendering Purpose May Be Taken In Consideration As Per Attached Annuxere-a Dt. 11.11.2010, As Per Drawin 2026-03-31
India Supply Of 79337806: Up Handlooms Handloom Cotton Bed Sheets As Per Is 745 Variety No - 12 (140 G) Of Size 229 X 140 Cm Brand: Up Handlooms (detailed Description/specification As Per Product # 4 Of Gem Contract No. Gemc-5 2026-03-31
India Supply Of Roof & Sidewall For Emu #*. One Coach Set Of Stainless Steel Roof And Side Wall For Stainless Steel 3 Phase Ac Emu D Coaches Without Forced Air Circulation To Drg. Nos. 77616001 Alt 'nil', Col I - 1 No, 57514001 Alt 'f' Col I- 1 No And Col Ii - 2026-03-31
India Supply Of Fire Retardant Rubber Based Adhesive #*. Fire Retardant Rubber Based Adhesive For Pasting Of Pvc With Plywood/aluminium /stainless Steel In Form Of Sets Of 25 Litre (one Set Comprises Of One 20 Litre Packing And One 05 Litre Packing) As Per Drg. 2026-03-31
India Supply Of 60110557: This Order Is For Drg. No. T-4218 Only------- Manufacture And Supply Of Pre-stressed Mono-block Concrete Sleepers, Pre-tensioned Type For Broad Gauge 1673 Mm, For 1 In 12 Turnouts To Drg. No. Rdso/t-4 2026-03-31
India Supply Of Gas Co2 Grade I (other Special Guidelines Issued By Cqm Vide L.no. C&m/gas/2007 Dt.16/3/07 To Be Followed For Tender & Procurement.) As Per Drg.no. Is:307-66, Quality Plan - N.a. 2026-03-31
Canada Subscription Renewal For Hand Hygiene Audit Solution For 5 Years 2026-03-31
India Providing Catering Services At Staff Canteen, Annex Building, Reserve Bank Of India, Belapur From June 1, 2025, To March 31, 2026 2026-03-31
India Supply Of Unf S&i Of Bio-retention Tank/lwllrm And Lslrd #*. Retention Tank With S-trap & Without Pressurised Flushing For Lwlrrm Coaches To Drg.no.mi006418, Alt-c, Anx-1 And As Per Specn. Mdts-26001, Rev-04(except Clause 3.5 -pressurised Flushing System) 2026-03-31
India Supply Of Dissolved Acetylene Gas #*. Dissolved Acetylene Gas For Industrial Use To Is:308/1988 With Amdt.no.1, Third Revision, Reafirmed-2011. [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-03-31
Whats app