Filter Search


Asia


Location Summary Deadline
India Supply Of Cylinder Power Assembly-blade #*. Cylinder Power Assembly-blade 40028015 Ca Spec:purchase Specification No. Misc-400 Rev-2 Dated 28.03.2016 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-09
India Project No 280_sulthan Bathery Municipality 2024_25 Manthamkolly Puthanpura Road Concrete In S_bathery Municipality Dn 34 2025-09-09
India Supply Of Dddr-pacemaker #*. Dddr- Pacemaker With Accessories (mri 3 Tesla Full Body Compatibility With Life Time Warrantee) 2025-09-09
India Strengthening Of Infrastructure Facilities To Zphs At Kambaladinne (v) Pamuru (m) Prakasam District (balance Work) 2025-09-09
India Pro No 53 Mamoodu Thundamankadavu Koratti Road Concrete Ward 17 Konni Gp 2025-09-09
India Supply Of Set Of Cgr Cams For Tap Changer #*. Set Of Cgr Cams For Tap Changer No.32 (one Set Comprising Of 03 Items, 03 Nos.) As Perrdso Drg. No. Skel-4638 Rev. 1, Sheet No. 1 And 2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-09
India Supply Of 45902896: Supply And Installation Aerosol Based Fire Detection And Suppression System Cartridges (2 Nos. Of 100 Gm.+1 No. Of 100 Gm. +1 No. Of 100 Gm. +2 Nos. Of 100 Gm.), Total 06 Pieces ( 1 Set Consists Of 06 2025-09-09
India Construction Of Cement Concrete Road At Tandali Bk Tq Patur Dist Akola In Magasvargiya Wasti Under Dr Babasaheb Ambedkar Samajik Vikas Yojana 2025-09-09
India Supply Of 35130830: Cup Sleeve Lower (sub Assly) For Schaku Coupler Todrg.no.- 40.586.06.01(4). As Per Rdso Specn. No.- 61-b-36/rev.-68-1,with Amnd. Slip No.- 1 Of October-2016. 2025-09-09
India Otp Bp 2024-25 Chelakkottumadam Colony Samagravikasanam Chunangad Divn -11 In Ambalapara Gp 2025-09-09
Whats app