Filter Search


Asia


Location Summary Deadline
India Construction Of Check Dam On Baratanr Joriya Under Block - Dumka, Dist -dumka 2025-09-12
India Supply Of 462301750016: 25 Kv System Rigid Bus Splice Connector To Suit 50 Dia Aluminum Tube On Both Ways (r.i No. 11180) Rdso Spec: Ti/spc/ohe/fittings/0130-10/13-rev-1, Drg: Eti Psi P 11180. Accepted Offer-make/ Brand- Nik 2025-09-12
India Supply Of 191800510010: Set Of Condition Basis Item For Knorr-bremse Make Air Dryer For Hhp Locomotive. One Set Consists Of 04 Items As Per Details Followings: (1) S.s. Pipe Assembly, Part No. I.3.3013, Qty. 01 Set/whole Set 2025-09-12
India Provision Of New Floor Tiles Inside Bunglow, Painting And Civil Repair Work In Outhouse And Garage And Outer Chequered Tiles Painting Work In The Premises Of Administrator Bunglow At C.h. Area, Jamshedpur. 2025-09-12
India Completion Of Balance Finishing Works I.e. Flooring, Doors And Windows, Electrical Installations And Other Ph Works In Primary School Located At Mata Chowk In Ward No 11 Of Mc Panipat (only For L/c Societies) 2025-09-12
India Restoration Of Road Cut Made By Cmwssb At J.j. Nagar In Div-25, Unit-7, Zone-3 2025-09-12
India Supply Of Tab Ribociclib 200 Mg #*. Tab Ribociclib 200 Mg ]tab Ribociclib 200 Mg ]tab Ribociclib 200 Mg ] 2025-09-12
India Annual Plan Parappur Gp 101202324 Maintenance To Allama Ikbal Road Allama Ikbal Kundottil Road 2025-09-12
India Supply Of 902100110194: Spring Loaded Stabilizer Auger Type Post Hole Digger 4- Mix/4-stroke Petrol Engine One Man Earth Auger With Quick Stop Break, Displacement: 36.3 Cm , Power Output: 1.9 Hp, Vibration Level Left/right: 2025-09-12
India Providing Manpower Services Of Drivers And Helpers To The Ignition Department. 2025-09-12
Whats app