Filter Search


Asia


Location Summary Deadline
India Supply Of Bracket For Fixing Luggage Rack For Ac3t Lhb, As Per Rcf Drg. No. Le44190, Alt. D. #*. Bracket For Fixing Luggage Rack For Ac3t Lhb, As Per Rcf Drg. No. Le44190, Alt. D. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Toleranc 2025-05-25
India Supply Of Lavatory Door Arrangement For Ac Coaches. #*. Lavatory Door Arrangement For Ac Coaches. Panel I.e, Item -2 Of The Drg. Tobe As Per Rdso Specification No C-k514, Revision-01 Of September,2023 And Colour And Shade As Per Rdso Approved Sample No. A 2025-05-25
India Supply Of Main Door Assly (lh) #*. Main Door Assly (lh) To Drg.no.icf/std-5-1-002, Alt.v/0,sh.1 & 2, Col.ii. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Per 2025-05-25
India Supply Of Valve Drain Cock 1/4 Mpt. #*. Valve Drain Cock 1/4 Mpt (air Compressor) Gd Part No:90wi,emd Part No:8063183. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Var 2025-05-25
India Supply Of Poh Kit For Duplex Check Valve Etc #*. Poh Kit For Duplex Check Valve Of M/s.escorts Make Consisting Of Four Items:1) Valve Head To Escorts Drg. No. 4a48128, 01 No. 2) Comp. Spring To Escorts Drg. No. 4b76146, 01 No. 3) Flat Sealing Ring To Esco 2025-05-25
India Supply Of Cover Assembly Set #*. Cover Assembly Set For Irs Electric Point Machine 143 Mm Stroke As Per (irs; S-24-2002 Amd-1) Also Attached Annexure And Drawing. Material Made Of Gi Sheet Minimum 2mm As Per Is 277 (2018 Orlatest). [ Warranty Period: 30 M 2025-05-25
India Supply Of Outer Bracket #*. Outer Bracket (lh) For Bio-tank To Icf Drawing. No.lcf/sk3 32963252. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-25
India Supply Of Cylinder For Brake 355 Mm. #*. Cylinder For Brake 355 Mm.wagon Stock To Rdso Drg.no.wd-92051-s-06.alt.5 Specn.no.02-abr-02, With Amendment 4 Of 2016 Appendix-b [ Warranty Period: 36 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 2025-05-25
India Supply Of Set Of Brackets For 60/9 Kva Transformer Mounting #*. Set Of Brackets For 60/9 Kva Transformer Mounting On Underframe For Lhb Eog Coaches As Per Icf Drawing No. Lwscwac/eog-7-1-003, Alteration (a) Or Latest. Set Consistingof The Following, 1) Lw 2025-05-25
India Supply Of Earthing Carbon Brush [scope Of The Supply As Per Sheet No.10] As Per Clw Specn.no.clw.es.3.0017, Alt-d. #*. Earthing Carbon Brush [scope Of The Supply As Per Sheet No.10] As Per Clw Specn.no.clw.es.3.0017, Alt-d. [ Warranty Period: 30 Months Af 2025-05-25
Whats app