Filter Search


Asia


Location Summary Deadline
India Improvement Of Water Supply To Zone-4 At Rairakhol Nac Reach-i 2025-05-26
India Supply Of Tm Phase And Ovlc Current Transducer #*. Tm Phase And Ovlc Current Transducer To M/s. Medha Part No. Sp628v2101026 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-05-26
India Construction Of Sub-centre Building At Harisingpur Under Tihidi Block In The Of For The Year 2023-24 2025-05-26
India Crack Filling Over Depillared Panel Of Bagdona Seam, Lower Workable Seam And Upper Workable Seam At Tawa Mine, Pathakhera Area, Wcl. 2025-05-26
India Construction Of (i) Naharhabi 3 No Line Road (from Ch. 0.00 M To Ch. 870.00 M), (ii) Mridha Line Road (from Ch. 0.00 M To Ch. 495.00 M) (total Length = 1365.00 M) Of Naharhabi T.?. 2025-05-26
India Mmppna_23_24_331 1.construction Of Lahingia Gaon Road From Ch. 0.00m To Ch. 600.00m, 2. Construction Of Road From Bharalua To Raghubari Via Nakatani Kalugaon From Ch. 0.00m To Ch. 490.00m (l0.490 Km), 3. Construction Of Road Fron Nh-37 To Naga Al From Ch. 2025-05-26
India Construction Of Health Sub Centre Gmhariya Under Block Masaliya In Dumka District. 2025-05-26
India Supply Of Sealing O-ring 35502000 #*. Sealing O-ring 35502000 As Per Drg.no. Is:9975(part-1)-1981 Reaffirmed 2019 Table-1 And Is:9975(part-2)-1984 Reaffirmed 2019 Material Class-a, Packing Instructions- Pi042 Ver.-01 [warranty Period: 30 Months After The 2025-05-26
India Supply Of Cheese Hd Screw M4x6 #*. Cheese Hd Screw M4x6, Coating As Per Mdts-057 As Per Drg.no. Is:1366-2022-4.8,packing Instruction - Pi001 [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-26
India Supply Of Hex Fit Bolt M12x27.5x50 As Per Drg.no. Is:3640-1982 (reaffirmed 2021), A2 To Is:1367(part-14)-2023, Packing Instruction - Spi001 [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-05-26
Whats app