Filter Search


Asia


Location Summary Deadline
India Tirupathur District General Fund 2024-25 4 Works In Bandarapalli Kothur Thukkupattu Panchayat Natrampalli Block Package No.02 2025-08-27
India Road Tarring Panchus Residence To Ramankandy Leela Rear Side Of Oniyan School In Ward 24 2025-08-27
India Annual Plan-adly Plan 2024-25 12-mile Mezhukumchal Road Maintenance In Ward 18 Of Adimali Gp-394/2024-25- 2025-08-27
India Supply Of 303501860046: Nylon Washer Id 09 Mm, Od 18 Mm And Thickness 04 Mm For 1/2 Inch Flexible Hose As Per Rcf Drawing No. Ae 36183 . 2025-08-27
China Contract Awarded For 0730-254010sz0019/04 Horizontal Copper Removal And Fouling Machine nantong Shennan Circuits Co.,ltd. Project-horizontal Copper Removal And Fouling Machine (rebid) Nantong Scc 2025-05-15 10:00 2025-05-16 20:18 - 2025-05-19 23:59 2025- 2025-08-27
China Contract Awarded For Package 3: Acoustic Doppler Flow Velocity Analyzer batch Of Procurement Of Marine Science Sensors(heavy) Tong Ji University 2025-05-21 09:30 2025-05-21 17:56 - 2025-05-26 23:59 2025-05-27 14:47.package 3: Acoustic Doppler Flow Veloci 2025-08-27
India 1)hermetically Sealed Compressor Suitable For Refrigerant Gas R22, 415 Volt, 3ph, 50hz, Model No.cr22k6m-tfm-131. Make Emerson Copeland Or Equivalent. Qty: 5 No 2)hermetically Sealed Compressor Suitable For Refrigerant Gas R22, 415 Volt, 2025-08-27
India Kyip Acp Plan 2024-25 - Rectification On Vykilassery Distributory Between Ch.0/150 Km To 0/300 Km. #*. General Civil Work 2025-08-27
India Annual Plan 2024-25 Pro.no 201 Farooq Mukk Edathodi Mukk Road Renovation 2025-08-27
India Annual Plan Kayamkulam Muncipalityproject No 665/ 2024 2025 Kunnil Road Drain Construction Ward 15 General Civil Work 2025-08-27
Whats app