Filter Search


Asia


Location Summary Deadline
India Supply And Construction Of Field Technical Shelter For Cadet Mess 2025-09-11
India Supply Of 38122571: Hand Brake Pull Rod For Boxn Wagon. Drawing No:- Wa/bg-6356, Alt-3, S.no.1. Mat Spec:- Is : 2062:2011 With Amnd. No. 1 Of Nov/2012 Or Latest, Grade E250 Quality A 2025-09-11
India Supply Of 18160013: Sensor Current Ibkbl Measures Up To 300 Amps To Emd Pt No-40046384 Make/ Brand-elixir 2025-09-11
India Supply Of 45178306: Battery Box Cover For Non Ac Coaches To Icf Drg. No.icf/sk-7-1-319 Alt. M/2, Col. No. 1 As Per Drg.no. Icf Drg. No.icf/sk-7-1-319 Alt. M/2, Col. No. 1 As Per Specn. As Per Drawing Firm's Accepted Ma 2025-09-11
India Supply Of Materials, Ghadla Kankar Jhajhra, Mortar-soil Mud Masala, Lime From Kali Kiln For Lime Masonry Work, Cement, Ppc, White Cement, Fine Aggregate, Sand Gravel, Gravel Local, Fly Ash, Surkhi, Stone Dust (stone Dust, In Masonry Work), Gitti Of Stone 2025-09-11
India Deposit Reformation Works Of Sulthan Bathery Kuppadi Road Mdr At Chainage 0 000 Km 0 950 Km 1 General Civil Work 2025-09-11
India Renovation Of Radhasala And Vahanasala At Sri Seetharama Swamy Temple, Pedaravuru(v), Tenali(m), Guntur Dist 2025-09-11
Philippines Contract Award: Provision Of Corn Seeds And Industrial Salt As Supplemental Inputs For The Cooperative At Brgy. Limpongo, Brgy. Sapad, And For Indigenous Peoples (ip) In Brgy. Datalpandan.project Id: P180320 procurement Method Request For Quotations langu 2025-09-11
India Comprehensive Maintenance Works Of Colony And Offices Of Satgram Gr. Of Mines And Satgram Area Hq Under Satgram Area, Ecl For A Period Of Two Years. 2025-09-11
India Improvement With C.d. Works To Kothari Pardi Pimpri Bhandarwadi Ritha Road (a) Sh-466 Km. 18/300 To 24/00 (b) Sh-466 Km. 24/500 To 25/500, Km. 26/600 To 32/00 Tq. Kinwat Dist. 2025-09-11
Whats app