Filter Search


Asia


Location Summary Deadline
India Contract Awarded For Delivery Of A Seminal Obligation And Other Material For A Period Of 4 Years delivery Of A Seminal Obligation And Other Material For A Period Of 4 Years value Of The Result: winner Selection Date : date Of Conclusion Of The Contrac 2025-09-10
India Contract Awarded For Remodeling Operating Area And Creation Of A Hybrid Ops-sanitary remodeling Operating Area And Creation Of A Hybrid Ops-sanitary value Of The Result: winner Selection Date : date Of Conclusion Of The Contract :28/05/2025 estimated 2025-09-10
India Pr No-78/2024-25 Pottavila Idaroad Re Concreting And Sidewall Construction In Ward 7 2025-09-10
China Contract Awarded For Hydrocarbon Sulfur Nitrogen Simulation Distillation Analyzer 2 Set sinopec Maoming Company Hydrocarbon Sulfur Nitrogen Simulation Distillation Analyzer Bidding Project China Petrochemical International Co.,ltd. 2025-05-26 09:30 2025- 2025-09-10
India Supply Of 38300151: 22.22mm Dia. Lock Boit & Collar For Freight Stock Conforming To Rdso Specification No. Is/rdso-wd/0001 Of June-2022, Grip Range = 31.75 To 38.10 Mm. 2025-09-10
India Supply Of 725814420013: Digital Three Point Internal Micrometer Range 150 - 175 Mm. Ip65, Tin, Least Count- 0.001 Mm., Mitutoyo Order No. 468-176 Or Similar, Accuracy: +/-5 Micron, Display- Lcd, Height-7.5 Mm, Measuring Face 2025-09-10
India Construction Of 1 One Unit Additional Class Room Dining Hall And Girls Toilet At Prodipdanga Primary School Under Ridf Xxx Project I 2025-09-10
India Construction Of 01(one) Tts Jawan Barrack Size (40 Ft. X 20 Ft.) Half Wall, Gci Sheet Walling And Roofing, With 4 Ft. Front Verandah At Battalion Hqr. Of 3rd Bn Tsr, Kachucherra No.1 2025-09-10
India Tender Invited For Drivers Seat Assly #*. Drivers Seat Assly For Wam4 Loco, Kpa's Drg. No. Er/kpa/ela/cb-015, Alt. 3. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-10
China Contract Awarded For Ht11 Production Capacity Increase And Major New Model Assembly Line Renovation ht11 Production Capacity Increase And Major New Model Assembly Line Renovation Shanghai Automobile Gear Works 2025-04-28 13:30 2025-06-05 17:01 - 2025-06- 2025-09-10
Whats app