Filter Search


Asia


Location Summary Deadline
India Construction Of Road And Drain From Burla Vip Road To Adarsh Vihar Near Golgunda Chowk, Wno.03 Under Smc, Sambalpur 2025-11-23
India Supply Of Ns: Rail Jumpers With Rail Clamps (al. Bronze Is:3091/1999) At Both Ends With 05 Mtrs Cable Length As Per Rdso Drawing No: Re/33/p/500, Re/33/p/501 And Re/33/p/504 Or Latest And Cable Should Be Of Single 2025-11-23
India Traction Motor Bearing Grease Of Servo Plex Tm3 .#* Traction Motor Bearing Grease Of Servo Plex Tm3 Of M/s Ioc Or Balmerol Multigrease Tm3 Of m/s Bl Or Shell Gadus Rail S2 Traction Motor Bearing Grease As Per Rdso Mp Mi 15 Revision12 Of Jan2019. [ warrant 2025-11-23
qty:141
>India
qty:141
>Tender Invited For Solar Street Light 40w Solar Led, Solar Charger Controller Inbuilt 120wp 12v, 60ah Li-po4 Battery, Steel Tubular Pole, 59mm 2 Core Cable 6 Mtr Per Price, Installations Charges
qty:141
qty:141
>2025-11-23
India Supply Of 601900240197: Manufacture And Supply Of Wider Psc Sleeper For Level Crossing To Drg. No.- 8969 (to Latest Alteration) And As Per Irs Specification T - 39 (to Latest Version) Both Amended Up To Date. 2025-11-23
Lebanon Contract Awarded For lbn-co-rfq-176-24 Rehabilitation Of Saida Observatory Bidder: Civil Engineering Reflections Amount: Usd 82,550.59 Contract Value (usd) 82550.59 Award Date 23-jan-2025.lbn-co-rfq-176-24 2025-11-23
India Pachur Parappattu Road Improvements Ward 5 In Vettikkavala Gp(29/25) 2025-11-23
India Brass Pipe Fitting Male Connector 6 Mm .#* Brass Pipe Fitting Male Connector 6 Mm Odx1/8" Bspt (m) As Per Clw Specification No. Clw/ts/99/cf/5 Alt-8 For 3-phase Loc os. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-11-23
India Annual Plan-2024-25 Areekkara Vayal Nambial Road Of Maruthonkara Gp-p No-320/25 2025-11-23
India Pgp 303/24-25 Thazathel Budanamkuzhy Road Retaining Wall In Ward No-1 #*. Concrete 2025-11-23
Whats app