Filter Search


Asia


Location Summary Deadline
India Construction Of Brick Paved Rasta From Dhurala To Mota Majra And Mohan Singh Wala Gohar, Vill. Dhurkra Block Ambala-1 2025-06-23
India Supply Of Hex. Nut M24-10 Prevailing Torque Type #*. Hex. Nut M24-10 Prevailing Torque Type To Specn. No. Din 6925 / Din 980v, Is:1367(pt.8)/2020, A3b Of Is:1367(pt.11)/2020 And The Item Should Be Procured From Rdso Approved Sources Of Axle End High Tensi 2025-06-23
India Supply Of Insulating Rod Used In Hitachi Tr-motor #*. Insulating Rod Used In Hitachi Tr-motor For Conventional Locos As Per Clw Drg. No. 2 Twd.095.052 Alt.9. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-23
India Supply Of Bearing Piece Assembly For Uncoupling Gear Arrangement #*. Bearing Piece Assembly For Uncoupling Gear Arrangement To Rdso Drg No Wd-00046-s-01, Alt. 7, Item No 4, 5,6 & 7. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-06-23
India Ae/pmn/retender/35/24-ponnari Ponnari Methal Road Ward 3 At Perumanna Gp 2025-06-23
India Ae/pmn/retender/68/24-25 Koranjolath Palam Chungappali Road -ward 8 At Perumanna Gp 2025-06-23
India Construction Of Bridge At Azhikode Kappakkadavu Nuchithodu Jamaath Palli 2025-06-23
India Ae/pmn/91/24-25 Parakkandam Puthiyaparmbath Palli Road Ward 11 At Perumanna Gp 2025-06-23
India Ae/pmn/69 / 24 - 25 P A R A Pulikkalthazham Road Ward 8 At Perumanna Gp 2025-06-23
India Ae/pmn/21/24-25 Puthukidi Kandileri Road Ward-1 At Perumanna Gp 2025-06-23
Whats app