Filter Search


Asia


Location Summary Deadline
India Construction Of Threshing Floor At Naduppalayam In Sadumugai Village Panchayat In Sathyamangalam Panchayat Union Of Erode District Under Agamt 2025-26 2025-11-05
India Annual Plan-muttikulangara M A Hall Back Road Interlock In Puthuppariyaram Gp 2024 -25- 103/25 2025-11-05
India Procurement Of Harting Make Jumper J Assy-4m Etc. .#* Harting Make Jumper J Assy-4m [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-11-05
India Roof Water Tank 30 Liters Mounting For L [roof Water Tank 30 Liters Mounting For Lhb coaches. Rcf Drg. No. Lw 63150 Alt D As Per Drg.no. Rcf Drg. No. Lw 63150 Alt D As per Specn. As Per Drawing] .#* Roof Water Tank 30 Liters Mounting For Lhb Coaches. Rcf 2025-11-05
India Retender Annual Plan - Proj No 55 / 24 - 25 Alungaparambu Kiriyarthodi Road Side Protection And Soil Filling In Kavanur 2025-11-05
India Cable Size .#* Cable Size 91/24 Awg ( Dlw Part No.18330095) Drg.no. Reference Dlw Chart D rg.no.9094883 Alt Ld Dlw Pt.no.18331130,drg.no.9094885 Rev-d Sizes Awg# 3 And Smaller, rdso Spec.no.edps-179 Alt F ] 2025-11-05
qty:5
>India
qty:5
>Tender Invited For Helmet Airborne (defence) (q3)
qty:5
qty:5
>2025-11-05
India Reconstruction Of Bus Station With Its Sub-work At Akkalkot In Division 2025-11-05
India 24v Starter Battery Charger For 500 Kva Da Set .#* 24v Starter Battery Charger For 500 Kva Da Set As Per Rcf Spec. No. Edts-106, am-1,2, Rev-nil, Cor-1. Packing Instruction - Spi146a. [ Warranty Period: 30 Months After The Date of Delivery ] ] 2025-11-05
India Procurement Of Harting Make Socket A Assy-2.5m Etc. .#* Harting Make Socket A Assy-2.5m [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-11-05
Whats app