Filter Search


Asia


Location Summary Deadline
India Needleless Vial Or Bag Withdrawal Cannulas Or Adopters 2025-06-20
India Needleless Vial Or Bag Withdrawal Cannulas Or Adopters 2025-06-20
India Needleless Vial Or Bag Withdrawal Cannulas Or Adopters 2025-06-20
India Needleless Vial Or Bag Withdrawal Cannulas Or Adopters 2025-06-20
India Supply Of Transformer For Blower #*. Transformer For Blower Type: Dkhr 315-2sb.090.6fa Ie-v0 As Per M/s. Medha Code No. Sp504141031 Of Hotel Load Converter In 3-phase Locos. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-06-20
India Supply Of 60060270%3a Manufacturing %26 Supply Of 1 In 12 Bg 60kg Weldable Cms Crossing On Psc Sleepers In Accordance With Rdsos Standard Drawing No.t-6412, Alt-03, Including Supply Of 6mm Thick Nylon Cord Reinforced Grsp As 2025-06-20
India Supply Of 60060281%3a Manufacturing %26 Supply Of 60 Kg 1 In 8.5 Bg 60kg Weldable Cms Crossing On Psc Sleepers In Accordance With Rdso's Standard Drawing No.t-6441, Alt-1, Including Supply Of 6 Mm Thick Nylon Cord Reinforced 2025-06-20
India Construction Of Grampanchayat Building At Sathegaon Tq Sindkhed Raja Dist Buldana 2025-06-20
India Day To Day Erection And Dismantling Of 220 V Oh Line At 06 No. Departmental Patch For Providing Lighting Power For Proper Lighting For Operation Of Shovel For A Period Of 270 Days Wrt Aadocm, Dhori Area 2025-06-20
India Diversion Of 3.3 Kv Oh Line For Providing Space For Mine Development And Erection Of 3.3 Kv Oh Line For Shovel Marching And Day To Day Erection And Dismantling Of 3.3kv Oh Line At 06 No. Departmental Patch For Providing Power At Aadocm, Dhori Area 2025-06-20
Whats app